My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOAQUIN Environmental Health Department <br /> COUNTY- <br /> 5. All primary containment including any integral secondary containment system must be certified by an <br /> independent testing organization and labeled as required by the organization (Title 23 Chapter 16,2631(b); <br /> (UL, ULC, ANSI, API, ASTM, etc. See Title 23 Chapter 16 Table B for complete list.) Pursuant to <br /> Underwriters Laboratories Inc (UL) listing requirements, only those products bearing the UL mark will be <br /> considered listed. ANY PART/PRODUCT NOT MARKED WITH THE UL LABEL OR ANOTHER LISTED <br /> TESTING ORGANIZATION WILL BE REJECTED. All secondary containment system which is not an <br /> integral part of the primary containment shall be designed and constructed according to an engineering <br /> specification approved by a state registered professional engineer or according to a nationally recognized <br /> industry code or engineering standard (Title 23 Chapter 16, 2631(d)). <br /> 6. Contact Elena Manzo at (209) 953-7699 for the following inspections. See permit inspection <br /> checklist for more information. All appointments must be scheduled a minimum of 48-hours in <br /> advance and are subject to inspector's availability. <br /> Li Inspection of tank vacuum gauge or inspection for brine leaks prior to tank placement in excavation. <br /> All tank's pre-installation tests shall be performed according to tank's manufacturer instructions. <br /> Xerxes tank installation checklist must be submitted to the EHD prior to the final inspection. <br /> Li Verification of tank set, anchorage, appropriate backfill in lifts, and appropriate additional corrosion <br /> protection of tank anchors (turnbuckles, eye bolts, etc.). Additional corrosion protection is required on <br /> all exposed metal prior to covering. <br /> i-i Test of all primary UST(s) containment according to manufacturer's specifications. <br /> o Primary piping soap test of all piping and penetrations (product, vapor recovery, and vent) according <br /> to the manufacturer's installation instructions: One-hour pneumatic pressure test at 110%of operating <br /> pressure, or 40 psi, whichever is greater. <br /> Ei Secondary piping slope (at 1/8 foot per foot or greater) to a containment sump with an audible/visual <br /> alarm. <br /> [-i Secondary piping soap test of all piping and penetrations (product, vapor recovery, and vent).- One- <br /> hour pressure test at the manufacturer's recommended specification. <br /> • Integrity testing of all sumps per the manufacturer's installation instructions prior to backfill, and brine <br /> type verification and brine addition prior to backfill. <br /> • Verification of all piping setbacks and burial depth according to the manufacturer's installation <br /> instructions. Verification of appropriate backfill and concrete installation. <br /> i-i Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic(VPH) <br /> components including piping, sumps, UDCs, and all chase/crossovers. Communication at the <br /> termination point of each vacuum zone must be verified. All appropriate connections to facilitate <br /> communication testing must be present. Chase piping must VPH monitored and included in its <br /> respective product piping vacuum monitoring zone. <br /> Ei Verification of the dispenser footprints contained by the under dispenser containment sumps (UDCs), <br /> any potential leaks from piping and fuel filters must drain directly into UDCs. <br /> Ei Enhanced Leak Detection (ELD) testing (after facility is in operating condition): appropriate test <br /> notification and test method disclosure is required <br /> VPH components installation verification (shroud boots for spill containers, band clamps for spill <br /> containers, fill, vent and STP sump rubber gaskets or clamps, etc.) <br /> D Overfill prevention verification prior to first fuel delivery: Measurement of drop tubes to verify 95%tank <br /> volume shut off and/or verification that external audible/visual alarm activates when tank is 90% full. <br /> An accurate drop tube and tank level gauge calculation must be provided to the EHD prior to <br /> scheduling this inspection. <br /> Ei Spill bucket test prior to first fuel delivery: Verify minimum 5-gallon capacity (with a calibrated <br /> container) and pass a one hour hydrostatic test (or equivalent). Proper drainage method must be <br /> verified. <br /> Ei Monitoring system functionality prior to first fuel delivery: Functionality of the monitoring system must <br /> be verified to ensure it meets the requirements of Title 23 California Code of Regulations and the <br /> Health & Safety Code (functionality and communication of hydrostatic, vacuum, and liquid sensors in <br /> tanks, sumps and under dispenser containments (UDCs)). <br /> Ei Leak detector test after first fuel delivery: Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi. Leak detector monitored line volumes shall be appropriate <br /> for the make and model of the installed leak detectors, and shall be verified at the time of installation. <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.