Laserfiche WebLink
SA N®J O Q Q V I I`I Environmental Health Department <br /> COUNTY <br /> 2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br /> ❑ Complete to scale As-Built Plans <br /> ❑ Complete Monitoring and Response Plan <br /> ❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance <br /> (one form per tank) <br /> ❑ Completed Underground Storage Tank Certification of Financial Responsibility <br /> form along with any required attachments <br /> ❑ Passing Line Leak Detector Test Results <br /> ❑ Passing Line Tightness Test Results (Required if the UST system does not satisfy <br /> the California Code of Regulations 2636(g) for automatic pump shut-off.) <br /> ❑ Passing Enhanced Leak Detection Results <br /> D. INSPECTIONS: <br /> Note: A representative from the San Joaquin County Environmental Health Department <br /> must witness all activities described below. <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior to <br /> installation in excavation <br /> ❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ Secondary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ 24-Hour secondary containment lake test on sumps and under-dispenser <br /> containment <br /> ❑ Piping Slope & cathodic protection prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test ofk antf`i IrEi <br /> monitoring system(s) including overfill prevention It <br /> ❑ Final inspection and demonstration of automatic shutdown (if applicob 9 2018 <br /> 5 of 8 . !P,.,�aNTAL HEALTH <br /> NIT <br />