Laserfiche WebLink
SANJ O A Q U I N Environmental Health Department <br /> —COUNTY- <br /> 2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br /> ❑ Complete to scale As-Built Plans <br /> ❑ Complete Monitoring and Response Plan <br /> ❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance <br /> (one form per tank) <br /> ❑ Completed Underground Storage Tank Certification of Financial Responsibility <br /> form along with any required attachments <br /> ❑ Passing Line Leak Detector Test Results = <br /> ❑ Passing Line Tightness Test Results (Required if the UST system does no Q <br /> the California Code of Regulations 2636(g)for automatic pump shut-off.) _ <br /> F-1Passing Enhanced Leak Detection Results N Q W <br /> U-1 ac <br /> D. INSPECTIONS: '— 0- <br /> Note: A representative from the San Joaquin County Environmental Health Depa e t C <br /> must witness all activities described below. <br /> Z <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior Cc W <br /> installation in excavation <br /> ❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ Secondary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ 24-Hour secondary containment lake test on sumps and under-dispenser <br /> containment <br /> ❑ Piping Slope & cathodic protection prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test of tank and piping <br /> monitoring system(s) including overfill prevention <br /> ❑ Final inspection and demonstration of automatic shutdown (if applicable). <br />