My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN <br />COUNTY <br />Environmental Health Department <br />2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br />❑ Complete to scale As -Built Plans <br />❑ Complete Monitoring and Response Plan <br />❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance <br />(one form per tank) <br />❑ Completed Underground Storage Tank Certification of Financial <br />Responsibility form along with any required attachments <br />❑ Passing Line Leak Detector Test Results <br />❑ Passing Line Tightness Test Results (Required if the UST system does not satisfy <br />the California Code of Regulations 2636(g) for automatic pump shut-off.) <br />❑ Passing Enhanced Leak Detection Results <br />D. INSPECTIONS: <br />Note: A representative from the San Joaquin County Environmental Health <br />Department must witness all activities described below. <br />❑ Tank holiday test (for fiberglass -coated steel tanks) performed prior to <br />installation in excavation <br />❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br />❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br />❑ Verification of tank set and anchorage in excavation <br />❑ Primary piping including product piping, vapor recovery and vent line piping <br />soap and pressure test <br />❑ Secondary piping including product piping, vapor recovery and vent line <br />piping soap and pressure test <br />❑ 24 -Hour secondary containment lake test on sumps and under -dispenser <br />containment <br />❑ Piping Slope & cathodic protection prior to covering <br />❑ Overfill performance test <br />❑ Prior to receiving fuel, a complete functional test of tank and piping <br />monitoring system(s) including overfill prevention <br />❑ Final inspection and demonstration of automatic shutdown (if applicable). <br />5of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.