Laserfiche WebLink
WALLET CARD (Wall Certificate — Page 2) <br />O P VV Installer Attestation No. P 100471 <br />_Efl `°""" Steve Jones <br />VR -102- UST <br />MVP Petroleum Engineering -Folsom <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: Feb 17, 2017 EXP Date: Feb 18, 2019 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures <br />when installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All <br />nozzles, vapor recovery systems and EVR PHASE I Systems must be installed and maintained in <br />accordance with manufacturer Instructions and procedures. Attestation applies ONLY to tested named <br />individual. <br />_ <br />fT A <br />F-11? <br />m <br />yy — <br />G ? <br />] <br />