Laserfiche WebLink
Fiber Glass Systems 1Key odu�tion olutions <br />January 4, 2016 <br />taln, .,..,or <br />Vie✓ t 1.. � <br />ung t� <br />MVP Petroleum Engineering, Inc. HAY <br />PO Box 281 ` A � 2U 17 <br />Folsom, CA. 95763 n;,fr,,EN; _ �rq <br />IALh� -ITI-I <br />PE <br />On 10 22 15 the following employees of (MVP Petroleum Engineering. Inc) completed bonder <br />training asset forth in Fiber Glass Systems Total Quality Installation Program for the installation of <br />UL listed Red Thread® IIA and Dualoy -3000L / 3000LCX primary and secondary containment piping <br />systems <br />MarkVendeiro Steven Flores <br />Steve Jones <br />Terrill Patterson <br />Robert L Lucero Mario Lucero <br />The cards verifying this completed bonder training will be mailed under separate cover within 5 <br />working days of this letter. A copy of this record of attendance will be kept on file at Fiber Glass <br />Systems. <br />Renewal of bonder training is recommended every three years. <br />Respectfully yours, <br />�, ;��aQ�OIYICaa'crt0 <br />Mrs. Lisa Blassingame <br />Western Regional Sales Manager -Fuel Handling <br />1 210•942 5771 401 McCaKhw Dive <br />F 210741OM L.eander,Tx.18641 <br />Lisa. Blasi rtgamN_ilnov.mm <br />