Laserfiche WebLink
1�� V� (•f `fJ /� /`� ..�. I••,.��,. <br />x g LEAK DETECTION <br /><) : Lac: <br />Exclusive P MDleak� sPr- <br />Providers for Rand PHDleak® Technologies[!-�-;: 5�;,�;1:;--:`,>': <br />1400 East Paseo Pa -von • Tucson, AZ 85718 Phone 855-255-5325 • FAX: 520.990.8965 <br />Sales@LeakDetect.net www.LeakDetect.net <br />New Construction Pretest Review Checklist for <br />Contractors <br />1. General: <br />a. Contractor must be onsite to make any repairs to the UST System identified by <br />LDT <br />b. Any specialty equipment required shall be supplied by contractor <br />Example; confined space entry equipment <br />2. Tank Sumps: <br />a. Primary vent piping should be pressurized to test pressure <br />b. Secondary vent piping should be pressurized to test pressure <br />c. Secondary boots must be completed and include test ports reachable by LDT <br />technicians <br />d. Tertiary boots must be completed and include test ports reachable by LDT <br />technicians <br />3. Dispenser/s, UDC/s, Transition Sumps, and/or Piping Terminations: <br />a. Primary product piping should be pressurized to test pressure at a test fitting <br />located at the piping termination end or shear valve. <br />b. Vapor return, and/or return piping should be pressurized to test pressure at a <br />test fitting located at the piping termination end or shear valve <br />c. Shear valves must be disconnected from dispensers and caped with steel caps <br />d. Secondary boots must be completed and include test ports reachable by LDT <br />technicians <br />i. Secondary piping including VR should be pressurized to test pressure <br />e. Tertiary boots must be completed and include test ports reachable by LDT <br />technicians <br />For questions please contact: David Rabb <br />VP of Business Development <br />Office 855-255 LEAK (5325) <br />David.Rabb@LeakDetect.net <br />_www.Leal:DetectionTechnolo ies com <br />www.LeakDetect.net <br />Author David Rabb <br />1 of 1 <br />