Laserfiche WebLink
E <br />T 7r A TT T— %T"TyT"s'1-`-VT/1i► t t iYL_� <br />LLC <br />7 <br />Exclusive Providers for MDleak® and PHDleak® Technologies <br />1400 Fast Paseo Pavon ° Tucson, AZ 85718 Phone 855-255-5325 ° FAX: 520.990.8965 <br />Sales@LeakDetect.net • ,vww.LeakDet-ect.nct <br />Final ELD Testing Instructions for Owners and Contractors <br />The state of California requires ELD testing at any facility whenever an Underground Storage Tank <br />is installed at a new or existing installation. The MDleak® Testing Method developed by Leak <br />Detection Technologies is the most versatile and flexible testing method in today's market. Owners <br />and contactors require quick and accurate results that can only be found by using the MDleak® <br />testing method. <br />California requires the industries best available technology to test their Underground Storage Tanks <br />(UST). These regulations help make California one of the nation's cleanest states from uncontrolled <br />UST releases. <br />Standard technologies such as pressure testing cannot detect or locate small leaks to California's <br />standards. Because small leaks can go undetectedMDleak® pretesting should be completed before <br />the final backfilling process is started. <br />We have completed a check list of expectation to guide the contractor and help make the site <br />personnel as successful as possible. <br />Scheduling: <br />1. LDT offer services throughout California. Therefore it is important that you schedule with us <br />around the time the tank pit excavation begins. <br />2. Early scheduling makes for an on time arrival of our crews. <br />3. Once we have the site scheduled we will contact the contractor by phone two weeks before <br />the scheduled arrival date to confirm the starting date and again at one week out. Phone 520- <br />2107-4878, Fax 5210-509-3720, or info@LeakDetect.net <br />Timing: <br />1. The State requires the fueling system to be completed before ELD testing can begin. <br />2. All finished ground surfaces shall be complete over the underground petroleum components <br />to be tested <br />3. All electrical and communication cabling including, conduit, conduit connections and covers <br />shall be complete <br />4. Spill buckets, fill and vapor adapters, ATG, drop tubes, caps, <br />5. Vent risers caped <br />6. Ballasted Tanks; LDT can test tanks that are water of product ballasted. LDT must be notified <br />in advance if the tanks will be ballasted during the test period. Static ballasted tank do <br />require additional time to test so when ever possible the contractor should remove all ballast. <br />Author David Rabb 1 of 2 <br />