My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
211151E <br />• ELD Test Result Submittal: Submit the results of the ELD test to the State Water <br />Board USTProgram and the local agency within 60 days after the test has been <br />performed [Id., § 2644.1, subd. (a)(5)]. <br />The address for submission of the ELD test results to the State Water Board UST <br />Program is: <br />State Water Resources Control Board <br />Division of Water Quality <br />Attention: Kevin L. Graves, P.E., UST Program Manager <br />ELD Test Results <br />P. O. Box 2231 <br />Sacramento, CA 95812 <br />Local Agency Responsibility: The local agency is responsible for working with the <br />tank owner/operator to approve the program of ELD (testing program plan) submitted by <br />the owner/operator within six (6) months following notification by the State Water Board <br />UST Program. The local agency also must follow-up on the ELD test results and <br />oversee implementation of the recommendations in the ELD test report. <br />What should be included in the proaram of ELD (testina program plan)? <br />The written plan must include: <br />• A modification/amendment to the existing UST monitoring plan; <br />• Submittal of standard documentation describing the third -party approved <br />process for implementation of the ELD requirement (often this is a generic <br />document developed by the testing company); and <br />• A signed access agreement between the testing company and the <br />owner/operator to have the ELD test completed or the proposed date that <br />the ELD test will be performed. <br />A program of ELD does not require a site-specific plan developed by the testing <br />company for each UST facility because ELD is a third -party certified UST system "test <br />method" with specific testing guidelines that must be followed in order for the test results <br />to be valid. <br />Which vendors are approved at this time to perform ELD? <br />At this time, we are aware of three vendors who meet all the regulatory criteria to <br />perform ELD. The three vendors are Praxair Services, Inc., CGRS, Inc., and Leak <br />Detection Technologies, Inc. CGRS is a licensee of Praxair Services, Inc. <br />Contact information for Praxair Services, Inc. is: <br />Praxair Services, Inc. <br />Attention: Anthony Ptak <br />3755 North Business Center Drive <br />Tuscon, AZ 85705-2944 <br />Phone: 1-800-394-9929 ext 234 <br />E-mail: anthony_ptak@Praxair.com <br />Web: www.praxair.com/services <br />California Environmental Protection Agency <br />C4 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.