My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 9:11:29 AM
Creation date
12/14/2018 4:34:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X Professiona ngineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1-87 Sump#2-Diesel Sump#3-91 Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 41" 44" 43" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14" 15" 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 11" 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 18" Water Line 20" Water Line 19" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:30 9:35 10:20 <br /> Initial Reading(Ri): .001 .001 .001 <br /> Test End Time: 10:00 10:05 10:50 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to Aany of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.