Laserfiche WebLink
r • pp <br /> CB,January 2006 <br /> Spill Bucket Testing Report Form JUL 0 6 <br /> This form is intended for use by contractors pei forming annual testing of UST spill containmQnt sn,t'ef a!,t tl;epcl feted form and <br /> printouts from tests(tf applicable),should be provided to the facility owner/operator for subiirtihal za.7he-7oecrjregulatoiy agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: FAST AND EASY Date of Testing: 06-08-16 <br /> Facility Address: 1399 YOSENITE AVE MANTECA CA <br /> Facility Contact: DEEP Phone: 209-823-3460 <br /> Date Local Agency Was Notified of Testing:05-19-16 <br /> Name of Local Agency Inspector(if present during testing): SAN JAOQUIN CO ELANA <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 211 Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ❑ David A.Winkler ® Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ®ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: TAPE/H2O Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DIE 4 <br /> Number,Stored Product, etc.) <br /> ®Direct Bury ®Direct Bury ®Direct Bury ❑ Direct Bury <br /> Bucket Installation Type: El Contained in El Contained in <br /> ❑Contained in Sump El Contained in Sump Sum Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 13 13 13 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 910 910 910 <br /> Initial Reading(Ri): 12 12 12 <br /> Test End Time(TF): 1010 1010 1010 <br /> Final Reading(RF): 12 12 12 <br /> Test Duration(TF—Tj): 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW BUCKETS <br /> ALL BUCKETS HOLD 5 GALLONS <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date:06-08-16 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />