My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 9:11:29 AM
Creation date
12/14/2018 4:34:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />RECEIVED <br />AUG 12 2gA of <br />Test Method Developed By: X Piping Manufacturer E Industry Standard <br />❑ Other (Spec) <br />Test Method Used: X Pressure Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />SEEMPiping <br />Run 41 <br />Piping Run #2 <br />Piping Run #3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 115' <br />Approx. 80' <br />Approx. 125' <br />Product Stored: <br />Regular 87 <br />Diesel <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:30 <br />9:35 <br />9:40 <br />Initial Reading (Rj): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />10:30 <br />10:35 <br />10:40 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Rj): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.