My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1755
>
2900 - Site Mitigation Program
>
PR0515454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
12/14/2018 4:36:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515454
PE
2960
FACILITY_ID
FA0012157
FACILITY_NAME
POMBO REAL ESTATE
STREET_NUMBER
1755
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23217020
CURRENT_STATUS
01
SITE_LOCATION
1755 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> Chevron <br /> Chevron Environmental Management <br /> April 30, 2001 Company <br /> 6001 Bollinger Canyon Road <br /> P.0.Box 6012 <br /> San Ramon,CA 94583 0712 <br /> Ms. Wendy Cohen <br /> California Regional Water Quality Control Board, Robert D.Mihalovich <br /> Pipeline Program Manager <br /> Central Valley Region Phone:(925)842-1341 <br /> 3443 Routier Road, Suite A Facsimile:(925)842-0213 <br /> Sacramento, California 95827-3003 <br /> Evaluation of Potential Impact from <br /> Proposed Percolation/Retention Ponds <br /> Pombo Property (APN 232-170-07) <br /> 1755 West 111h Street <br /> Tracy, California <br /> and <br /> Ridgeway (former Burns) Property (APN 232-170-05) <br /> 1881 Rustan Road <br /> Tracy, California <br /> Dear Ms. Cohen: <br /> Per our April 27, 2001 telephone conversation, Chevron Environmental Management Company <br /> (Chevron) is submitting the subject report for your review. This report documents a Geomatrix <br /> Consultants, Inc. (Geomatrix) April 2001 evaluation of the potential impact from two storm <br /> water percolation/retention.ponds that Regency Centers (Regency), the property developer, plans <br /> to construct on the subject properties. Chevron requests that the Regional Board review the <br /> subject report as soon as possible. Chevron and Regency are available to meet with Regional A <br /> Board staff to review the findings of this report and the planned pond construction. It is <br /> Chevron's understanding that Regency plans tq start construction of the ponds during the week of <br /> May 14, 2001. <br /> Chevron has performed environmental investigation activities at the Pombo and Ridgeway <br /> (former Burns) properties. These activities were documented in reports which were transmitted <br /> to your office in February 2001. <br /> Based on the results of the April 2001 evaluation, Regency intends to modify their <br /> percolation/retention pond design to excavate petroleum-affected soil within the pond footprint <br /> on the Pombo property and to install a barrier over the remaining in-place affected soil to <br /> minimize effects of dissolved-phase constituents within the shallow aquifer zone. Regency <br /> intends to reuse the excavated petroleum-affected soil beneath paved in-fill areas of the <br />. P P , <br /> Ridgeway property development; soil reuse will be performed as outlined in the Soil <br /> Management Plan (enclosed). <br /> In order to facilitate your staff's review of the subject document, Chevron herein approves the <br /> use of the Bruns Property cost recovery account for your staff's review time for this site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.