Laserfiche WebLink
MONITORING SYSTEM CERTI ATION <br />CERTIFICATION /TEST DATE: June 8, 2012 <br />Al. FACILITY A2. OWNER <br />Name Tracy 76 - Reliance Gas Investments, Inc. Name Jivtesh Gill <br />Address 2420 W. Grantline Road, Tracy, CA 95337 Address 4855 South State Hwy 99, Stockton, CA 95215 <br />Phone# Phone# 209-948-2438 <br />Contact Jivtesh Gill Contact Jivtesh Gill <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ Yes ❑ No* Has all Input wiring been Inspected for proper entry and termination, Including testing for ground faults? <br />❑ WA <br />❑ Yes ❑ No * Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ Yes <br />❑ Yes ❑ No * Was accuracy of system product level readings tested? <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes ❑ No * Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />❑ Yes ❑ No* Were all Items on the equipment manufacturer's maintenance checklist completed? <br />❑ N/A <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box If LLDs are not installed. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ WA <br />(check all that apply) Simulated leak rate. ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow If It detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off If the LLD detects a leak? <br />❑ WA <br />_ <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system is disabled <br />❑ Yes <br />❑ No* <br />❑ WA <br />or disconnected? <br />❑ Yes <br />❑ No* For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions <br />❑ NIA or fails a test? <br />❑ No * For electronic LLDs, have all accessible wiring connections been visually Inspected? <br />❑ Yes <br />❑ N/A 11 <br />❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ Yes <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />