Laserfiche WebLink
RECEIVEC) <br />UST SYSTEM RETROFIT OR REPAIR AUG 13 2014 <br />(Submit minimum of 3 sets of plans & applications as originals will be retairk 1l <br />EfVTgL HEALT, <br />1. Site map enclosed? YES [ ] NO [� `)f-PARTMENT <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />n ► I , i n A <br />Ww-pf�s <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />yeec -ear A� �� - ISar' 'r? 2-0 <br />3 <br />9'd £96896860Z wneloa}ad elgel1e?1 eLt,:90 t, L £ L 6ny <br />