Laserfiche WebLink
1 � <br /> 7 <br /> Waste <br /> Oil r —i SB-3 VSB-2 <br /> a� <br /> Tank <br /> c Planter <br /> m <br /> a <br /> BUILDING MW-3 <br /> SB-2 <br /> r6 '•� w <br /> >o / Z <br /> MW-4 Ureter MW-2 Q <br /> ` <br /> °oaS <br /> o <br /> - - - - - -I I i B-1 MW-1 MW B M� IX <br /> 'i10K gK I I O <br /> z <br /> Approbmate +f Canopy and <br /> UST I I Dispensor Islands <br /> VSB-1 <br /> Planter <br /> L — — — — — — — <br /> 9 <br /> Planter <br /> YOSEMITE AVENUE <br /> EXPLANATION <br /> Monitoring Well <br /> Monitoring Well <br /> (abandoned) <br /> Soil Boring <br /> ® Drain <br /> Proposed Angle Soil Boring <br /> and direction of boring 0 30 60 <br /> Approiomate <br /> Scale <br /> NOTE:Site Plan Map after Site Map by Aegis Environmental, Inc., 1/14/92 1"=30' <br /> DRAWN BY: T. E. Ballard PROPOSED VERIFICATION SOIL FIGURE <br /> DATE: 4/12/94 <br /> REVISIONS BORING LOCATIONS 2 <br /> /////APEX Moore Petroleum <br /> E N V I ROTE C H,INC, 1 399 East Yosemite Ave NNUMBEJMBER: <br /> Manteca, CA ERA02.006 <br />