Laserfiche WebLink
7-1 <br /> TABLE 3(continued) <br /> VAPOR EXTRACTION OPERATING DATA <br /> MOORE PETROLEUM <br /> 1399 E.Yosemite Blvd. <br /> Manteca,CA <br /> ARBON ADSORPTION FILTER VAPOR EXTRACTfON OPERATING DATA <br /> DATE TIME STACK FLOW FID READING m OMMENTS <br /> VELOCITY RATE BLOWER FIRST STACK <br /> C TLET OUARBON EFFLUENT <br /> 07/05/95 10:15 2400 51 NM NM NM afbon system start up,samples co0ccted <br /> 07/1 M5 12:30 3300 71 3 0 0 <br /> 07/18195 14:15 3700 79 0 0 0 onnected horizontal VES pipe in line <br /> 07/25/95 14:00 4300 92 0 0 0 Lefi system in initial VES configuration <br /> 07/31/95 12:00 3800 81 0 0 0 <br /> 08/04/95 9:15 4000(assumed) 85 1 0 0 3hut system dawn for pulsing <br /> 08/15/95 8:15 4200 90 0 0 0 IcTformed system pulse,Ie&system of <br /> 09/19/95 8:00 4800 103 0 0 0 erfofined system pulse,left system of <br /> 10/16/95 9:45 4500 96 0 0 0 erfmmed system pulse,left system off <br /> 11/27/95 9:50 4200 90 0 0 0 lerformed system pulse,left system of <br /> 12/26/95 1 10:25 1 4300 1 92 0 0 0 erformed system pulse,left system off <br /> APOR EXTRACTION PROJECT CONCLUDED <br /> APEX ENVIROTECFL INC. <br /> SECOND QUARTER]996 <br /> FRM1006 <br />