Laserfiche WebLink
1 <br /> DESCRIPTION <br /> 112'OD Nylon Tubing <br /> 4i A S AVE System <br /> \ 0 B Vapor Masture Knock-out <br /> D C Vapor Particle Filter <br /> D Compressed Air Filter <br /> F F E E Compressed Air Tanis 30 gallons <br /> ' F Carbon Canisters(55 gallon drum) <br /> / G Water Discharge Flow Meter <br /> G H Shut Off Switch <br /> ' K ___=_ --- --- z ABS to Storm Sewer I Plan Box <br /> per UPC J Fire Extinguisher 401b ABC <br /> K 8'Chain Link Fence with Slats <br /> B 9 Pressure Guages <br /> c <br /> ' ; \ Sampling Part <br /> A <br /> G� \ <br /> C <br /> I <br /> ' 4" PVC Conduit —I?! <br /> i4 Op Y1p�7Ub,R 1 Site to be leveled on concrete pad <br /> 2"PVC to MW-1 B -_= <br /> tnmed by a14 x 4 inch concrete curb <br /> 2" PVC to Tank Basin - _= 2 #r4 Rebar On 18"Centers, #4 Rebar In <br /> Curb Tied To Pad Steel <br /> 112"Schedule 80 <br /> Rapped Black Pipe <br /> to Tank <br /> ' A <br /> I f <br /> / I <br /> ' \ Approximate Scale <br /> 1"=2' <br /> o z <br /> 1 <br /> ' FIGURE 10 <br /> ' PLAN VIEW OF SAV E.SYSTEM <br /> Moore Petroleum <br /> 1399 East Yosemite <br /> Manteca,CA <br /> � AEGIS Job No 90-098 <br /> DRAWN BY Dennis Hada DATE. January 24, 1992 <br /> ' REVIEWED BY' DATE <br />