Laserfiche WebLink
h , <br /> VAPOR EXTRACTION PULSE DATA <br /> MOORE PETROLEUM <br /> ' 1399E Yosemite Blvd. <br /> Manteca,CA <br /> ' TABLE 4A VAPOR EXTRACTION SYSTEM PULSE AUGUST 15,1995 <br /> Inlet Stack Stack <br /> Tense Well FID Velocity Flow <br /> (ppm) (ft/min) (CFM) <br /> 750 MW-lB&HORIZ 0 5300 113 <br /> 751 13 4300 92 <br /> ' <br /> 752 6 4200 90 <br /> 753 4 4300 92 <br /> 754 2 4300 92 <br /> 755 2 4300 92 <br /> ' <br /> 756 15 not measured — <br /> 757 13 not measured <br /> 758 13 4300 92 <br /> ' <br /> 759 09 not measured <br /> goo 07 not measured — <br /> 801 05 not measured — <br /> 902 04 4300 92 <br /> 803 04 not measured <br /> 804 03 not measured <br /> 805 03 not measured — <br /> 809 03 not measured <br /> 814 02 not measured <br /> 819 0 4200 90 <br /> SYSTEM TURNED OFF <br /> Note <br /> HORIZ = Underground honzontal plpmg <br /> i <br /> 1 <br /> 1 <br /> ' APEX ENVIROTECH,INC <br /> FOURTH QUARTER 1995 <br /> ' ERA02 006 <br />