Laserfiche WebLink
1 <br /> ! PSI--Oakland Project: Interra Development <br /> 4703 Tidewater Ave Ste B Project Number: 865-86002 Reported: <br /> Oakland CA,94601 Project Manager: Frank Poss 01/30/08 13:51 <br /> Notes and Definitions <br /> S-GC Surrogate recovery outside of established control limits.The data was accepted based on valid recovery of the remaining <br /> 1 surrogate(s). <br /> QR-02 The RPD result exceeded the QC control limits;however,both percent recoveries were acceptable.Sample results for the QC <br /> batch were accepted based on percent recoveries and completeness of QC data. <br /> ! QM-07 The spike recovery and or RPD was outside acceptance limits for the MS and/or MSD. The batch was accepted based on <br /> acceptable LCS recovery. <br /> D-02 Hydrocarbon pattern present in the requested fuel quantitation range but does not resemble the pattern of the requested fuel. <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> ' NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> ! <br /> 1 <br /> ! <br /> i <br /> 1 <br /> 1 <br /> ! SunStar Laboratories,Inc. The results in this report apply to the samples analyzed in accordance with the chain of <br /> ciatody document. This analytical report must be reproduced in its entirety. <br /> ! Albert Vargas For John Shepler,Laboratory Director Page 24 of 24 <br />