My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 12:05:19 PM
Creation date
1/7/2019 4:05:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank-Monitoring Plan <br /> Facility/Site <br /> ity gas and liquor UST Tank# CERSID <br /> 16470 Cambridge Dr TA0520817 10779784 <br /> Lathrop,CA 95330 Tank Info:Installed Date:8/17/201812:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Regular Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Under Vacuum veederroot veederroot <br /> Panel Model# Leak Sensor Model# <br /> TLS-350 PLUS 001 VAC <br /> Yes Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> veederroot Yes <br /> ELLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> plid 848480 Yes <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> UDC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> veederroot Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> UDC Panel Madel# Yes <br /> Is-350 PLUS UDC Monitoring Stops Flow of Product at Dispenser <br /> UDC Leak Sensor Manufacturer <br /> EEDER ROOT UDC Construction <br /> UDC Leak Sensor Model Double-walled <br /> 08 UDC Secondary Containment Monitoring <br /> Liquid <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Yes <br /> Periodic System Testing <br /> ELD Testing <br /> Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 1/14/2019 1:53 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.