Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT Installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: ❑X 3 GPH El 0. 1 GPH El 0.2 GPH RX <br /> Was the testing apparatus properly calibrated? N ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑X I ❑ I ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak Is detected? ❑ I ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected ? Q ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑X ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑X ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Q ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? 0 I ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br /> X111. COMMENTS , <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC ' MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑X Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑X Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other Describe the method In section XV below. ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑X Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail " above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS = 4 ' <br /> _. <br /> V31, r <br /> EPA9T AEN <br /> GPH = Gaflons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuumtPressure/Hydrostatic, ID = Identification <br />