My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
15971
>
2800 - Aboveground Petroleum Storage Program
>
PR0515798
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:37:55 AM
Creation date
1/8/2019 9:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515798
PE
2832
FACILITY_ID
FA0009326
FACILITY_NAME
HALEY FLYING SERVICE INC
STREET_NUMBER
15971
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
18912012
CURRENT_STATUS
01
SITE_LOCATION
15971 S TRACY BLVD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALEY FLYING SERVICE, INC. <br /> P.O. BOX 1049 <br /> TRACY, CA 95378 <br /> (209) 836-0213 <br /> Mrs. Janice Wind, Coordinator-R9 Oil Program; US EPA <br /> Mr. Cesar Ruvalcaba, Inspector; San Joaquin-CUPA <br /> Subject: Haley Flying Service/Fuel Island Project <br /> Dear Colleagues: <br /> Please be advised on Tuesday, December 3, 2019 nducted a preliminary <br /> inspection/walk-through with SPC Corporation wing your published NOV <br /> (Notice of Violation) in conjunction with a neital investment: construction of a <br /> NEW fuel-island as follows: <br /> 1. Our main fuel-assembly of 10,000 g�of Jet A (not challenged in NOV) <br /> 2. Conversion of singlewall 1000- AST for gasoline to chemical-tank <br /> processing (non-petrol) <br /> 3. Installation of 1800 doubl AST for gasoline on new concrete pad <br /> 4. Conversion of singlewall 50-gallon mobile-diesel/AST (nurse tank) to chemical- <br /> tank processing <br /> 5. Installation of 1800 doublewall AST for diesel on new concrete pad <br /> 6. Installation of 1800 doublewall AST for AvGas on new concrete pad <br /> Our short/long-term objectives are to request forebearance/recission of the NOV once <br /> the construction is completed, new testing of the fuel-island is conducted <br /> simultaneously with the expiration of the existing SPCC plan and the <br /> composition/certification of a new SPCC plan, utilizing current templates in <br /> conformity with federal/state/local (San Joaquin-CUPA) guidelines. Our anticipated <br /> completion of the construction phase is approximately 45 days,weather-permitting. <br /> We have provided photographic evidence (attached) to confirm our commitment to <br /> this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.