Laserfiche WebLink
7 0 Next Scheduled Formal inspection <br /> Comments <br /> re tank is equipped with spill control and/or CR DM(continuous <br /> release detection method)and is considered a Category 1 tank per <br /> table 5.5 of STI SP001.The next formal inspection would be required <br /> in 20 years or as required by the sites SPCC Plan.The inspection <br /> Formal Inspection Is Required in(years): schedule is based on the site completing the recommended repairs <br /> as noted in the inspection report. If problems are identified during <br /> periodic inspections a formal inspection may required soon.The <br /> condition of the equipment may change after the issuance of this <br /> report. <br /> ther <br /> 7 <br />