My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
2800 - Aboveground Petroleum Storage Program
>
PR0527770
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:43:38 AM
Creation date
1/8/2019 9:28:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527770
PE
2832
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
01
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for TERESI TRUCKING LLC as of December19, 2019. <br /> Open violations from January 02, 2019 inspection <br /> Violation#818-Failed to keep records of procedures,inspections,or integrity tests for three years. <br /> Copies of inspection and testing records for monthly inspections were not found on site. Inspections and tests must <br /> be conducted in accordance with the written procedures developed in the Spill Prevwtion, Control, and <br /> Countermeasure(SPCC) Plan. Records of these inspections and tests must be signed by the appropriate superviso <br /> or inspector and kept on she with the SPCC Plan for a period of three years. Immediately locate a copy of all <br /> inspection and testing records for the last three years, maintain them on she, and submit copies to the EHD or begin <br /> to conduct inspections in accordance with the SPCC plan. <br /> 13 This violation was corrected Qlhls violation will be corrected by(date): <br /> ❑ Supporting documents Included <br /> Describe actions taken or will be taken to correct violation: <br /> r <br /> O'l � <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.