Laserfiche WebLink
March 2018 <br /> AGE-NC Project No. 18-4333 <br /> Page Lf of 6 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER/SITE TASK: <br /> SAFETY OFFICER: <br /> Timothy J. Cuellar Oversee site safety; coordinate soil <br /> sample collection <br /> FIELD TEAM OFFICER/MEMBER: TASK: <br /> Keith Lindgren, Rick Marty Operate probe machine; collection of soil <br /> samples <br /> Rene Toth, Erin Rottacker Log and preserve soil samples <br /> The works party(ies) were briefed on the content of this plan at the site on <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around Leave area immediately <br /> waist: <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> Advanced GeoEnvironmental,Inc. <br />