Laserfiche WebLink
28 March 2018 <br /> AGE Project No. 18-4333 <br /> Page 4 of 4 <br /> 3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools used for sample collection, except for disposable bailers, will be <br /> thoroughly rinsed with clean water after being washed with a solution of Alconox. All <br /> down-hole drilling equipment will be washed prior to starting each boring. Any soil <br /> cuttings generated during drilling and/or rinseate generated during drilling and <br /> groundwater sampling activities will be containerized in properly labeled DOT-approved <br /> 55-gallon drums, and stored on-site in an area lacking public access. Disposal <br /> alternatives will be evaluated based on results of soil and water analysis. <br /> Advanced GeoEnvironmental,Inc. <br />