My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
400
>
2900 - Site Mitigation Program
>
PR0508245
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 4:39:48 PM
Creation date
1/11/2019 8:32:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508245
PE
2950
FACILITY_ID
FA0008014
FACILITY_NAME
ISE LABS ASSEMBLY OPERATIONS
STREET_NUMBER
400
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22119048
CURRENT_STATUS
01
SITE_LOCATION
400 INDUSTRIAL PARK DR
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC SM SAFETY PLAN <br /> EMERGENCY RESPONSE <br /> In case of an emergency the project safety officer must be notified by the site safety officer or <br /> project manager. The site safety officer or her/his alternate will notify outside emergency <br /> response agencies (ER) as needed, the branch safety officer, and the project <br /> supervisor/manager. The branch safety officer will make any required reports to local, state, and <br /> federal agencies. Other emergency notifications will include: <br /> ER Agency: Fire/Police Depts. Phone: 911 <br /> ER Agency: Ambulance Phone: 911 <br /> Site Safety Officer: Tom Lutterman Pager No: 209/9395321 <br /> Site Safety Alternate: Drew Van Allen Office Phone: 209/579-2221 <br /> Project Manager: Jeanne Homsey Office Phone: 209/579-2221 <br /> Corporate Dir. Health and Safety: Steven Warren Office Phone: 605/338-0555 <br /> Employees may only fight small fires which have not spread beyond the original source. Spills <br /> should be cleaned up as outlined in the ATC spill response procedure. Spills may be cleaned up <br /> by properly prepared personnel as follows. <br /> Spilled Material Neutralizer PPE Monitoring <br /> PAGE 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.