Laserfiche WebLink
NWP SPCC Table 2 <br /> Oil Storage,Testing,Secondary Containment,and Potential Discharge Information <br /> (Arid more rows ea needed) <br /> Oil StorageType of Oil Shell Capacity Overfill Testing Testing Type of failure Potential Direction of Secondary Secondary <br /> Containepb,' (gallons) Protection Method° Frequency' (discharge stenarg) discharge flow for containment containment <br /> Methodd volume uncontained method 9 capacity In,I <br /> (gallons) discharge (gallons) <br /> Dkeselfuelstoa,adenk Diesel 10,000 Ovocillpbareaionvaq P,E,L Release from fuel 10000 SEgarealNtowants Diked containment area 11,500 <br /> w Category ordainment,hose middle mad (41'x 15'x 02.6t Commented[Hi Please add more derailed deem ption of <br /> each cental ner.This seems redundant,but the"name"of the <br /> Gasoline fuel stone Oscura unleaded 300 assuming stick and P Month visual Release from fuel 300 SE enteral towards Diked containment area Sank is what we refer to throughout the SPCC and Internally, <br /> (unleaded) , N , N lets ba consistent.Thankel <br /> tank order volume insspeDpon for <br /> signs of dispensing hose middle mad (61'x 15'x02.5') <br /> PST Cat ,ory 2 mana,amect inspection forsgns of Commented[HS2]:2CT can be defined using be footnote <br /> Qivf celebration and code like"(1)"if you m moose.Your onoice P will keep As Is <br /> discharges Commented[VD3R2]:Will keep as is <br /> Transmission flub id 5 <br /> Transmission fluid Measuring g stick and P Monthly visual Hconnection failure 500 E generally towards Diked ed containment a 1,800 <br /> storage tank om'ervolume inspection/Annual visual dein to batch basin. (3]'x IV x 0.5) n........ <br /> mnlxccr -.� �,� n�,: <br /> AS-Caegory2 management inspeclrnforsgnsof <br /> 0011 celebration and <br /> discharges <br /> Mods ail storage tank Motor oil 500 Measuring stick and P Monthly visual Hose connection failure 500 E generally towards Diked containment area 1,800 <br /> AFT Ca my2 oNervolume inspection/Annual visual dean to batch basin. (3]'x IV x 0.5) <br /> management inspection for signs of 1iu n,u oieJ side he 2L <br /> 0011 celebration and <br /> discharges Commented jiffs ]:Diesel and Gasoline tank share <br /> Hydraulic fluid stome Hydraulic fluid 500 Measuring stick and P Monthly visual Hose connection failure 500 Eganarally towards Diked containment area 1,800 2CT.Total 2CT capacity is correct.11500,this will hold <br /> tank order volume inspection/Annual visual dean to batch basin. (3]'x IV x 0.5) 11000 required lar Diesel tank and 330 gal requlred by <br /> AY-cat'i 2 management inspection for signs of Gasoline. <br /> celebration and Commented IHSS]:These should be is not"III`since Ihmc <br /> 01) discharges not an coma gauge <br /> .but OPS Is me[by someone <br /> Mai refuabr D'eselsGacoline 2,200 Apason represent to P Monthly visual Failure of tank shell 250 Direction of flow wour Dked Containment 285 m0ni0 no B an SOP. <br /> D'esel me W Got 8 monitor unit filling and inspection/Annual visual due to vehicle impact; depend on the teatrn Parking under awning <br /> Gas me(71)0 Gel.) refueling to units onsite inspection ler signs of of the truck at the time (containment for Comm ented(HS2]:Technically these need to be managed <br /> Category 0011 deterioration and of the discharge;HE refuebrtank) as 2 separate tanks ad please Indicate the van ume of each <br /> discharges generally 12'x12 x 0.25' manksl. <br /> Emergency generator Diesel W Oder volume P Monthly visual Failure of tank shall W Eganarally towards Custom fabricated 100 <br /> management gh inspection/Annual visual due to vehicle impact dean to batch basin (model summand <br /> inspection ler signs of sparked or otherwise <br /> dabbratlon and attached and sexed to <br /> discharges concrete slab under EG <br /> skid)containment <br /> 8.3'.4'x 0.5' <br /> gallon used oil dams used oil 1 parson keprasentto P Monthly visual Drum mature or bale 110 Eganarally towards Containment palet 120 Commented IHS9]:Technicaty.misisbeshell capacity of <br /> (2)in Mainteman sin monitor drum filling inspection/Annual visual dean to batch basin (69'),69"x11") inch storage container ner_Sm It should be"55'Iar ata bwl <br /> (n{) nspectbn forsgns of e <br /> celebration and undersand that you are adding mem bah_Tha should be <br /> discharges line.he los,lust wanted to pmt nt ma quirk auk <br /> 55 gallon grease Oman in grease 55 A parson re present to P Monthly visual Drum mature or leak 55 Eganarally towards Containmentdebt 120 l Commented lVU18R9]:Sounds good. <br /> Maintenance area monitor drum filling inspection/Annual visual dean to batch basin (d9kd9' V) <br /> 0011 inspection far signs of s FCCommented(HSB]:Example detailed description <br /> celebration and Commented IHS31]:Alls,rage containers need a melhad <br /> discharges o1 OSP.even drums.For drums and rotes"iv won<s,and you <br /> 55gallms hydraulic fluid Hydraulic fluid 220 A parson re present to P Monthly visual Drum mature or leak 220 Eganarally towards ddrum containment 240 reference an external SOP/Baining/ac balance <br /> drums(4)in Maintenance Frando HD) monitor drum filling inspection/Annual visual dean to batch basin. palet momred detail. <br /> area (N) Inspection fab signs of <br /> celebration and <br /> discharges <br /> 55gallons solvent drums Solvent 220 A penton re present to P Monthly visual Drum mature or leak 220 Eganarally towards ddrum containment 260 <br /> (d)in Maintenance area. monitor drum filling inspection/Annual visual dean to batch basin. debt <br /> (N) In£IXctrn fab signs of <br /> dabbratlon and <br /> discharges <br /> SS,albn lubricatin,oil Lubcbatin,oil(EPS) 185 Apercon keprasentto P Monthly visual Drum mature or leak 185 Eganarally towards Diced contsoment area 1,800 <br /> drums in Mantenanea monitor drum fillip, inspaetrnlMnual visual dean to batch basin. (3]'x 13'x0.5) <br /> area(3) 0011 inattention far signs <br /> of <br /> dabbratlon and <br /> discharges <br /> Page 1 of 2 <br /> Table Template Dated 09/05/2019 <br />