Laserfiche WebLink
OPEN CLASS II VIOLATION #726 <br /> CFR 112.8 (c)(8) Plan failed to adequately describe overfill <br /> prevention methods for each container. The SPCC plan does not <br /> discuss the overfill protection for the mobile refueler. Amend the <br /> SPCC plan to include discussion of allowed overfill protection for all <br /> regulated tanks or provide equivalence as allowed by CFR <br /> 112.7(a)(2). <br /> Corrective action <br /> The SPCC plan will be updated to include the mobile refueler as bulk <br /> storage container and will describe meeting criteria for general <br /> Secondary Containment requirements. <br /> The mobile refueler will be considered as Category 1 for integrity <br /> testing (<5,000 gallons, with spill control (i.e.-spill kit) and with <br /> Continuous Release Detection Method (it is located off the ground, all <br /> sides/bottom visually available, employees work nearly and would <br /> quickly react to and use the nearby Spill Kit, for any observed leaks) <br /> .... ........................................................................................................................................ <br /> Northwest Pipe Company <br />