Laserfiche WebLink
HAZARDOUS WASTE CONTINGENCY PLAN <br /> For we by Umdocs Hkndrer Agencies or where approved by your Local Jurisdiction <br /> Author4 Cited Mle 22, Cahfonda Code ofRegulaitam(CCR)§66265.52 as referenced by§66262 34(a)(4)or 67450.3(c)(9)(C) <br /> Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br /> kilograms of hazardous waste on-site at any one time, most prepare a Contingency Plan. Facilities that generate <br /> in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br /> resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br /> onsite treatment tier most also prepare a Contingency Plan. Many facilities that are required to prepare a <br /> Contingency Plan are already subject to Hazardous Materials Business Plan(HMBP) reporting requirements due <br /> to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Unidocs <br /> HMBP, or already have a plan which is equivalent in content to the Emergency Response/Contrngency Plan <br /> module of the Urudocs HMBP, you have satisfied the Contingency Plan requirements, and are not required to <br /> complete the blank plan, below. <br /> This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br /> immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br /> hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br /> the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br /> local agency. A copy of the plan and any revisions most be provided to any contractor, hospital, or agency with <br /> whom special (i.e., contractual) emergency services arrangements have been made (see Section E, below). <br /> A. Facility Information: <br /> BUSDJIsSSNAtvlE BUSB SPHONE <br /> Northwest Pipe Company (209) 836-5050 <br /> SITEADDR s CrrY ZIP CODE <br /> 10100 W Linne Road Trac 95377 <br /> B. Emergency Coordinators: <br /> All personnel qualified to act as the facility's Emergency Coordinator most be listed in this plan. (Note: <br /> Emergency Coordinator responsibilities are described in Section F, below) If more than two people are <br /> qualified, list the names, fides, business and 24-hour telephone numbers, and pager numbers of the additional <br /> qualified individuals on an attached page in the order in which they will assume responsibility as alternates, then <br /> check the box beneath the Emergency Coordinator information table, below, and indicate the list's page number <br /> in the space provided. <br /> Primary Emergency Coordinator secondary Emergency Coordinator <br /> NAME NAtvIE <br /> AnthonyWright Denisse Vi non <br /> TIME TME <br /> Plant Manager EHS Coordinator <br /> BUSDJESS PHONE BUSDJFSS PHONE <br /> (209) 666-8951 (209) 666-8967 <br /> 24-HO[JR PHONE M-HO[ PHONE <br /> 209 362-5598 832 833-5697 <br /> PAGER# PAGER# <br /> ® (Check box only ifapplicoble)Additional Emergency Coordinators are listed on page A of this plan. <br /> C. Evacuation Plan: <br /> 1. The following alann signal(s)will be used to begin evacuation of the facility(checkall that apply): <br /> []Bells; ®Homs/Sirens; ®Verbal(ie., shouting); ❑ Odrer(spec <br /> UNA17 www.unidocs.org 1/7-Roc 1L1Nla <br />