<br /> PERFORMANCE SPECIFICATION
<br /> W
<br /> SECTION I GENERAL CONDITIONS - CONTINUED SECTION 11 INSPECTIONS / TESTING o
<br /> SECTION I GENERAL CONDITIONS "
<br /> TEST BEFORE PLACING THE SYSTEM IN SERVICE
<br /> o W W
<br /> PART 4 - CONTINUED W
<br /> PART1 - GENERAL Table below lists current Manufacturer's Installation and Testing Guidelines that may � � U
<br /> WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE FURNISHING OF ALL 4.11 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS be applied to the fuel system components after assembly but before backfilling.
<br /> 1.1 SCOPE OF WORK: THE SUBCONTRACTORS, LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND SAVE OWNER Before the beginning of fuel system installation, fuel contractor is to be responsible W H
<br /> LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS. for reading through the entire Installation Manual and Operating Guidelines as well as 0- U
<br /> TO THE COMPLETE CONSTRUCTION OF A GASOLINE INSTALLATION FOR 7-ELEVEN, INC. any applicable supplemental materials. It is the responsibility of the fuel contractor
<br /> . and fuel operator to understand and follow all requirements contained in the
<br /> 412 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, UNLOADING,
<br /> w CN
<br /> PART 2 - AGREEMENT HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL. installation and testing manuals. Work must be performed according to standard m o 0
<br /> 2.1 CONTRACTOR SHALL NOT START WORK WITHOUT CONTRACT AND APPROVED SEALED PLANS. CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING TO industry practices applicable to tank installations and operations. Work must also 0 C
<br /> THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY comply will all applicable codes, regulations and standards of appropriate
<br /> WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER
<br /> SPECIFICATIONS COMPONENT MANUFACTURER governmental agencies. ho
<br /> D S P EC I F I C FOR OPENING. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S
<br /> PART 3 INTENT O F D RAW I N G AN MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE. INSTALLATION n omt'assetsm;/'/, umuidelilik earyjinslallati2OL(I
<br /> n3ar3€1a '!�;Z.l:c'.rad°j>�(:C:prat111�i:�2t),�'L11flc.11ll:"�i>t�.l.'( r3'S f>�;)�c.7.��$�+t,�> Proto 08-21-17
<br /> MANUAL � __._..._m_...... .
<br /> 3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE WORK OR IMPROVEMENT WHICH THE 4.13 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION OF DOUBLE WALLED STORAGE XERXES "A ZCL 2C�xer es% Otariks.pdf
<br /> _._._.
<br /> LL COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE.
<br /> CONTRACTOR SHALL PERFORM IN FU TANK COMPANY' � ff n '
<br /> PERFORM ALL WORK NECESSARY TO COMPLETE THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER.
<br /> TESTING I��tpT,:�vvvv<„yel.cpm,rassetEsJdacurraeratis/lih)rary,rinst�sllatiori`.•�20
<br /> 4.14 FUEL CONTRACTOR SHALL PROVIDE ALL PIPING, WIR77
<br /> ING, MATERIAL AND LABOR AS REQUIRED TO INSTALL OWNER PROCEDURE
<br /> 3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS TO SUPPLIED EQUIPMENT. INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS 2Ost tsesf20tar ks.pdf
<br /> THE OWNER'S CONSTRUCTION MANAGER. NOTED OTHERWISE, http://www.nov.com/Segments/Completion_and Production_
<br /> INSTALLATION p
<br /> 3.3 THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. ANYTHING MENTIONED IN THE MANUAL Solutions/Fiber_Glass_Systems/Fuel_Handling/Red_Thread_IIA. LOaspx
<br /> SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE - PROTECTION DOUBLE-WALLED PIPING NOV U)
<br /> PART 5
<br /> SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS TESTING q� L z
<br /> DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND 5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMEN TO THE PROCEDURE http://www.nov.com/docHandier.aspx?puid=12bNZwiC3oL35C LU 2
<br /> METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR THE WORK. IT IS NOT INTENDED PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR INSTALLATION http://www.gilbarco.com/gold/gold_public_access.cfm?section V 1-- I j o
<br /> TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR SHALL MAKE GOOD ANY LOSS, DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE. MANUAL _id=361 Z Z LU � Q
<br /> TO SHOW ON THE DRAWINGS ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE LEAK DETECTION SENSOR VEEDER ROOT (�
<br /> OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON, ALL MATERIALS OR LABOR FOR WORK WHICH IS 5.2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, LIGHTS, SIGNS OR OTHER TESTING http://www.gilbarco.com/gold/gold_public_access.cfm?section Z > U) Q LL
<br /> SHOWN ON THE DRAWINGS OR IS REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS: PROCEDURE _id=361 - U
<br /> PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS, ALLEYWAYS OR PRIVATE RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN PROPER INSTALLATION http://www.gilbarco.com/gold/gold_public_access.cfm?section W ❑ I. Z W
<br /> 3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND ASCERTAIN EXISTING CONDITIONS
<br /> CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF WORK. MANUAL _id=364 Q Z d
<br /> ART OF THEIR PORTIONS OF THE WORK. BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL WORK REQUIRED AUTOMATIC TANK GUAGES VEEDER ROOT W U Y
<br /> PRIOR TO THE ST MEASUREMENTS AT THE SITE. ANY TESTING htt :./E 4vvv.Lt.eder.uc,mr`t€sjproductsJ<Is-a€€tG uratic tank-gauge gauge J IY rn U z
<br /> CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL M FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND AROUND THE BUILDING SITE, ASSUMING ALL PROCEDURE - -- - Z
<br /> ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS OR RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE yst_ms,te t g-ti; bonsoles/tis-3 r-Oris tic tank-;ave W ~ J
<br /> DIFFERENCES WHICH MAY BE FOUND BETWEEN N
<br /> SHOP DRAWINGS SHALL BE SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE HAS VERIFIED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK. LLJ
<br /> PROCEEDING WITH THE ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL CONTRACTOR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON-JUNCTION WITH THE INSTALLATION http://www.opwglobal.com/docs/libraries/manuals/retail-fueli m LL
<br /> ERROR HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S RELOCATION'S OF EXISTING UTILITIES AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY MANUAL ng/below-ground/opw-fcs-manuals/71so-testable-(h15524pa) Q
<br /> CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING WITH WORK. EASEMENTS, HOOKUP CHARGES, TAP FEES & SYSTEM DEVELOPMENT FEES OR BONDS AS NECESSARY FOR COMPLETION 1-30-14.pdf?sfvrsn=4 =
<br /> OF THIS PROJECT. OVERFILL PREVENTION DEVICES DPW p
<br /> 3.5 THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND THE ARRANGEMENT OF THE TESTING ng/be/www.o nd/op -com/docs/libraries/m able-(/l552-fu )- o
<br /> PROCEDURE ng/below-ground/opw-fcs-manuals/71so-testable-(h15524pa) N
<br /> DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN 5.4 IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL PROPERLY COVER OVER, SECURE M
<br /> THE ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. 1-30ww sfvrsn=4
<br /> AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE.
<br /> ht{:��!`',v�'tR: cxlswglcrbal,cE.rrnldocsjfil�rxarierrrrrranualsf�t'rail,ft€t';i
<br /> DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS ARE 5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT IN TANKS INSTALLATION
<br /> 3.6 DRAWINGS AND SPECIFICATIONS. ARCHITECTURAL PLANS AND
<br /> ..gjb ic:vror€n lrrpvti fcs-rn rt lsf:l-: 1t70 EDGE Thread-On
<br /> NS FROM ARCHIT TIL TURNED OVER FOR OPERATION. ALL FILL, VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE MANUAL spill Srtstal,�,Cien..lnst 202181 2-1'- 3 t�. _�ff.Statias--Master&
<br /> DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS UPON DELIVERY UN
<br /> EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE FIELD. SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT. _..........::::._....._......_...............__.._.....__:::._._...._..._._____T_„_
<br /> SPILL-CONTAINMENT 4=r'`'e€=Q
<br /> DPW sf
<br /> MANHOLES
<br /> http://www.opwglobal.com/docs/libraries/manuals/retail-fueli
<br /> PART 4 - RESPONSIBILITY OF THE CONTRACTOR PART 6 - SUBSTITUTION OF MATERIALS TESTING er below-ground/nation Imanuals/Double_Wall_Spill_Contain
<br /> PROCEDURE er_Vac_Test_In d/opw-fcsInstructions=_ le_Wh_20 ill_Codfain
<br /> 4.1 CONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE PROPOSED IN WRITING WITH atus=Master&sfvrsn=0
<br /> ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN
<br /> APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE. http://www.opwglobal.com/docs/libraries/manuals/retail-fueli
<br /> THAT HE UNDERSTANDS ALL CONDITIONS.
<br /> INSTALLATION ng/below ground/opw-fcs-manuals/10_Series_Emergency_She E19
<br /> 4.2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FAMILIAR WITH THE CONDITIONS MANUAL ar Valve Installation_Instructions=_English_H11374PA.pdf?St
<br /> AFFECTING THE WORK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON BEHALF OF THE PART 7 COMPLETION O F CONTRACT atus=Master&sfvrsn=0
<br /> -
<br /> CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE PERFORMANCE OF THE CONTRACT, IMPACT VALVES DPW
<br /> LATENT CONDITIONS AT THE SITE ARE FOUND TO BE MATERIALLY DIFFERENT FROM THOSE INDICATEDT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE STIPULATIONShttp://www.opwglobal.com/docs/libraries/manuals/retail-fueli
<br /> BY THE DRAWINGS AND SPECIFICATIONS, OR UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF 7.1 THE CONTRAC , BOND OR BY TESTING ng/below-ground/opw-fcs-manuals/10_Series_Emergency_She
<br /> THIS CHARACTER SHOWN AND SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER LAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL IN AND ACCEPTANCE MADE BY ALL APPLICABLE PROCEDURE ar_Valve_Installation_Instructions_-_English_H11374PA.pdf?St
<br /> SHALL BE CALLED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR OTHER JURISDICTIONS.
<br /> atus=Master&sfvrsn=0 w
<br /> 4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS 7.2 NOT USED INSTALLATION http://www.vaporless.com/installation/installpdf/install_Id200 ol
<br /> z
<br /> df
<br /> O.p
<br /> REPORT. MECHANICAL LINE LEAK VAPORLESS MANUAL 4;; ',
<br /> 7.3 CLEANING: DETECTORS MANUFACTURING
<br /> TESTING http://www.vaporless.com/installation/installpdf/install_Id200
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID PROCEDURE O.pdf
<br /> SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL 7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE TEMPORARY TAPES,
<br /> POSSIBLY DETERMINE A DIFFERENT UTILIZATION OF THE TANK STRAPS AND TYPE OF BACK FILL WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS. INSTALLATION - ' y
<br /> MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION, ELECTRONIC LINE LEAK MANUAL http://www.veeder.com/gold/download.cfm?doc id=6414 _y
<br /> WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER. 7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH DETECTORS VEEDER ROOT
<br /> MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES OR OTHER TESTING
<br /> Y OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED IN PROCEDURE http://www.veeder.com/gold/download.cfm?doc_id=6414
<br /> 4.4 CONTRACTOR SHALL REPORT AN _ 07 - 0
<br /> CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN A THE WORK. FRANKLIN INSTALLATION ttp /,fwt�w fran i n € rl€ng cons/rr€etiia(468560,4(772 30C11- ;f.
<br /> FLEXIBLE CONNECTORS
<br /> DECISION BEFORE PROCEEDING. FUELING MANUAL x-c r} rtt tczr ir,tali pWf 1
<br /> 7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION,
<br /> 4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY KEEPING THE PREMISES NEAT AT ALL TIMES.
<br /> 7-ELEVEN'S LOCAL CONSTRUCTION MANAGER, "COST OF CONSTRUCTION" PROPOSALS SUBMITTED ON ANY
<br /> OTHER FORM SHALL BE REJECTED AND RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED PART 8 - CODES PART 1 - GENERAL
<br /> OUT SHALL BE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING `-
<br /> IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION. 1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS REQUIRED TO PROVIDE LO 0 \00 0 J
<br /> 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE INSPECTION SERVICES OF THE FUELING INSTALLATION. 0 O Z ~
<br /> 4.6 PERMITS: CONTRACTOR SHALL, AS DIRECTED BY 7-ELEVEN, PAY FOR ALL APPLICABLE PERMITS AND AND FEES. COPIES OF STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE
<br /> PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL 7-ELEVEN CONSTRUCTION MANAGER'S OFFICE OR SITE STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE: PART 2 - INSPECTIONS ¢ co z O
<br /> MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES
<br /> SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF FINAL 8.1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE Q > m
<br /> m
<br /> PAYMENT REQUEST. 2.1 INSPECTOR: 7-ELEVEN, INC. LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE SHOULD BE -p
<br /> 8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING, STAGE I & STAGE II PIPING PRIOR TO BACKFILL. Qj U
<br /> 4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION SYSTEMS."#RP-100-96 (OR LATEST EDITION)
<br /> PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR NOTIFICATION, SITE PREPARATION REQUIREMENTS, 2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 7-ELEVEN'S CONSTRUCTION DEPARTMENT 48 U M
<br /> COMPLIANCE, ON-SITE PRESENCE DURING INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS 8.1.3 OSHA AND LOCAL MUNICIPALITIES HOURS PRIOR TO REQUESTED INSPECTION Cn0 ❑ U
<br /> DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO
<br /> INSPECTION. 2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING, LOCAL 7-ELEVEN o -0 c
<br /> NMENTAL
<br /> FUEL CONTRAC00
<br /> TOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE PART 9 - WARRANTY / GUARANTEE OF PRODUCTCONSTRUCTIASWELL AS ACTIONN DEPARTMENT TOBEROKEN BY CONTRACTOR TO SAFEARTMENT ARE GUARD TBE HE EVENT FFIED ROM FURTHER MISHAP ISHAP AND TED LOSS
<br /> F (D `0 > � 0 m u 3 y 2-
<br /> 4.8 COORDINATION. F o w o
<br /> INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT. THE g 1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1)YEAR, THE CONTRACTOR AGREES TO REPAIR TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED. ' m - o M a E = m ' M
<br /> BUILDING GENERAL CONTRACTOR AND THE FUEL CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE o o t o c a)0 � o o c E
<br /> INSTALLATION. TIMETABLE FOR BUILDING AND GASOLINE AND RE-CERTIFY OR REPLACE THE DEFECTIVE COMPONENT OR ANY DEFECT IN MATERIAL OR WORKMANSHIP (BEYOND
<br /> SCHEDULE AND TIMETABLE FOR COMPLETION ON THE GASOLINE ORDINARY WEAR AND TEAR)TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE (1) 2.4 REPRESENTATIVE OF CONTRACTOR AND FUEL CONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING PROGRAMS. m @ aL c o r Y 3�'
<br /> SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER. YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS REQUIRED BEING m o 3 x-0 o o m o.� o U
<br /> OWNER. PERFORMED BY OWNER AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM w o N >Y Y E CTD
<br /> SHOULD FUEL CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE AND/OR HOLD UP THE CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION. aci c L Q°� c-°o ° o o
<br /> OF THE OVERALL BUILDING PROJECT, 7-ELEVEN, INC. RESERVES THE RIGHT TO RECTIFY THE SITUATION g 2 ALL PAVING WILL HAVE A TWO YEAR WARRANTY. o U o t-ro U~
<br /> ACCORDINGLY. 2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE c° ami 0-Mo -
<br /> COMPLETION c a� a
<br /> DURING INSPECTION PROGRAMS. NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST o E-E ° o ` � 0- L a
<br /> OEco-o N._ " NE
<br /> in
<br /> 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: PROCEDURES. o w o r 3 2-M
<br /> m
<br /> O L
<br /> 4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR CONTRACTOR PART 10 - AS BUILT PLAN AND D O C U M E N TAT I O N 2.6 INSTALLATION REPORTS: SHOULD 7-ELEVEN OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT SITE
<br /> CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE TANK SYSTEM. FOR PURPOSES OF FILING ANY INSPECTION REPORTS, CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION �C+OFCB
<br /> 10.1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "AS-BUILT SITE PLAN"VERIFYING FINAL LOCATION OF AND FILING OF REPORT WITH LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDE ti
<br /> IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, PIPING, PLUMBING AND ELECTRICAL.
<br /> 4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, PRODUCT LINES, PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES. t y
<br /> IATE COMPANY FOR
<br /> ATG-S, ETC.)AS TO ATTENDING AND ACHIEVING CERTIFICATION FROM APPROPR
<br /> 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE INSTALLATION. PHOTOGRAPHS 2.7 TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR SHALL IMMEDIATELY INSTIGATE '�rJrJ'� ... ' 6
<br /> INSTALLATION OF EQUIPMENT. 8 � '
<br /> ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED TO LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE, WITH FINAL PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK
<br /> INVOICE PACKAGE.
<br /> 4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE SYSTEM BEING REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR w� 2
<br /> PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY. �NAN�� �
<br /> 01r C.FtfMt�Q
<br /> 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR HAS BEEN 2.8 CLEANUP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING WARRANTY PERIOD 11/26/18
<br /> INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED AND QUALIFIED DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AS MAY BE REQUIRED.
<br /> SHEET:
<br /> FOR THAT SPECIFIC ITEM.
<br /> 2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION COMPANY SHALLG13 . 0
<br /> BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION REPORTS WITH LOCAL 7-ELEVEN, INC.
<br /> CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE.
<br /> FUELING - USA