Laserfiche WebLink
PERFORMANCE SPECIFICATION - CONT . <br /> z <br /> W <br /> SECTION IX CANOPIES - CONTINUED SECTION IX CANOPIES - CONTINUED SECTION X POST CONSTRUCTION TESTING REQUIREMENT 0 F <br /> C 0 <br /> 0uW <br /> ui PART 2 - EXECUTION PART 3 - GENERAL - CONTINUED PROCEDURES FOR POST CONSTRUCTION TESTING N ' <br /> r) W 0 <br /> 2.3 FASCIA: � 0 <br /> 3.2 EXECUTION: 1.1 SCOPE OF WORK L } <br /> W 1- <br /> 2.3.1 VERTICAL SUPPORTS SHALL BE DESIGNED AND SPACED PER ENGINEERED (DESIGNED TO LOCAL 3.2.1 COORDINATE DELIVERY AND INSTALLATION WITH FUEL CONTRACTOR THROUGH LOCAL THIRD PARTY TESTS ARE REQUIRED TO BE PERFORMED ON ANY POST CONSTRUCTION ACTIVITIES ASSOCIATED WITH NEW 0- 0 <br /> CODES) STRUCTURAL DRAWINGS SUPPLIED BY CANOPY MANUFACTURER. SCREWS FOR FASCIA CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS INDICATED BY INSTALLATION, UPGRADE, REPLACEMENT OR REPAIR OF OR TO THE UNDERGROUND STORAGE TANK(UST) SYSTEMS, IF THE 00 o <br /> SHALL BE CARBON STEEL CADMIUM PLATED OR GALVANIZED - SIZE AS REQUIRED. FUEL CONTRACTOR. WORK INVOLVES PRODUCT PIPING, TANK SUMPS, DISPENSER SUMPS AND PANS OR SPILL CONTAINMENT BUCKETS. o c� <br /> cu N O <br /> 2.3.2 REFER TO PROJECT DRAWINGS FOR FASCIA MATERIAL AND INSTALLATION. 3.2.2 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR BOLTS AND TANKNOLOGY, INC IS CURRENTLY UNDER CONTRACT TO PERFORM ALL REQUIRED TESTS AS THE NATIONAL 3RD PARTY TESTING o 0 <br /> TEMPLATE FOR DELIVERY TO FUEL CONTRACTOR 2 WEEKS PRIOR TO CONTRACTOR AND MUST BE USED TO PERFORM POST CONSTRUCTION TESTING TO ENSURE THAT 7-ELEVEN MAINTAINS <br /> 2.3.3 MATERIAL SHALL BE ONE OF THE FOLLOWING: INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN ACCORDANCE WITH FUEL CONTINUITY WITH THE COMPANY'S REGULATORY COMPLIANCE TESTING PROGRAM. THE ONLY EXCEPTION APPLIES IF LOCAL as <br /> CONTRACTOR'S SCHEDULE OF CONSTRUCTION. REGULATIONS REQUIRE THAT THE INSTALLATION CONTRACTOR PERFORM THE REQUIRED TESTS AND THE TESTS ARE <br /> A. PRE FINISHED METAL FASCIA SYSTEM. WITNESSED ON SITE BY A REGULATORY ENTITY, IN THESE CASES THE INSTALLATION CONTRACTOR MUST SUBMIT <br /> B. PRE FINISHED FASCIA MATERIAL AS SELECTED. 3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY DOCUMENTATION OF THE REGULATORY WITNESSED TESTS, AS WELL AS THE RESULT OF ANY SUCH TEST, DIRECTLY TO Proto 08-21-17 <br /> FUEL CONTRACTOR AS PER APPROVED SHOP DRAWINGS. TYPE OF CONCRETE SHALL BE AS PER 7-ELEVEN, INC, COMPLIANCE DEPARTMENT. <br /> SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED STEEL SHALL BE AS PER SHOP <br /> DRAWINGS. IT WILL NOT BE NECESSARY FOR TANKNOLOGY TO RETEST A COMPONENT WHICH WAS TESTED BY THE CONTRACTOR IF THAT <br /> PART 3 - GENERAL TEST WAS WITNESSED BY A REGULATOR. IN THESE CASES THE CONTRACTOR MUST SUBMIT RESULTS OF THE TEST AS WELL AS <br /> 3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND NOTIFY 7-ELEVEN, COPIES OF REGULATOR INSPECTION REPORT WITHIN 48 HOURS OF COMPLETION OF THE TEST TO THE ADDRESS LISTED BELOW <br /> INC.'S CONSTRUCTION MANAGER IMMEDIATELY OF ANY DISCREPANCIES FOUND. REFER TO SITE co <br /> co <br /> 3.1 FABRICATION DRAWINGS: PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY THE REQUIRED TESTS ARE DIVIDED INTO TWO CATEGORIES, PRE-FUEL TEST AND POST FUEL TEST. C) <br /> 3.1.1 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEERED AND STAMPED SHOP 3.2.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN LOCAL THE TESTS PERFORMED DURING EACH PHASE ARE LISTED BELOW. U <br /> DRAWINGS FOR OVERHEAD STRUCTURE AND FOUNDATION SYSTEMS. INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED. A COPY OF THE PERMIT QQ rc",4 O <br /> MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR TO COMMENCING WORK. PRE-FUEL TEST -TEST PERFORMED BEFORE FUEL IS INTRODUCED OR DELIVERED INTO THE UST SYSTEM. f ; Lu 3.1.2 DRAWINGS SHALL SHOW PROJECT LOCATION AND ADDRESS. 3.2.6 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE WITH THE FOLLOWING TESTS ARE RECOMMENDED TO BE PERFORMED BEFORE FUEL IS INTRODUCED INTO THE UST SYSTEM: ZZ Q <br /> 3.1.3 ORIGINAL ENGINEER'S STAMP FOR APPROPRIATE STATE SHALL BE AFFIXED TO EACH PAGE OF ACCEPTABLE INSURANCE AS REQUIRED PER 7-ELEVEN, INC. INSURANCE SPECIFICATIONS AND — z UDRAWINGS. STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE IN EFFECT FOR DURATION OF LL <br /> WORK. PRE-FUEL TEST ESTIMATED TEST DURATION Z -3.1.4 SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SOILS REPORT NUMBER AND DATE FOR WHICH w 0 WCANOPY FOOTINGS WERE DESIGNED. 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF OTHER STP SUMPS MINIMUM 4 HOURSCONTRACTORS ALREADY IN PLACE, AS MAYBE REQUIRED. DISPENSER SUMPS/CONTAINMENT MINIMUM 4 HOURS W 3.1.5 SHOP DRAWINGS SHALL SPECIFICALLY CALL OUT SIZE, WEIGHT, TYPE AND NUMBER OF ALL SPILL CONTAINMENT BUCKETS MINIMUM 1 HOUR STRUCTURAL MEMBERS. 3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING APPROVAL OF 'J ZFUEL CONTRACTOR PRIOR TO PLACING OF ANY HEAVY EQUIPMENT ON TOP OF lui 3.1.6 ALL DESIGN LOADS SHALL COMPLY WITH CURRENT BUILDING CODES AND LOCAL BUILDING DEPARTMENT CONCRETE WORK ALREADY IN PLACE. TANKNOLOGY MAY USE ONE OF THE FOLLOWING TEST METHODS: HYDROSTATIC, PRESSURE OR VACUUM. mJ <br /> REQUIRED LOADINGS, WHICHEVER IS MOST STRINGENT. MINIMUM DESIGN LOADS SHALL BE <br /> W <br /> CONSIDERED TO BE: WIND 100#, LIVE 35#, UPLIFT 35#AND DEAD LOAD 35#ORAS LOCAL 3.2.9 ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED TO 95% MAXIMUM WATER USED TO PERFORM THESE PRE-FUEL TESTS MAY BE DISCHARGED ON SITE AS LONG AS THE WATER WAS NOT IN Q LL <br /> STRUCTURAL DESIGN DICTATES. IF APPLICATION IS SUBJECT TO HIGH ALTITUDE (SNOW) LOADING, DENSITY BASED ON A.S.T.M. D 1557-70. IF ANY POOR SOIL CONDITION IS DISCOVERED DURING CONTACT WITH ANY FUEL. _ <br /> DESIGN SHALL BE ADJUSTED TO COMPLY ACCORDINGLY. EXCAVATION, THE DESIGN ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOR SOIL BEARING o <br /> VERIFICATION. CONTRACTOR PREPARATION FOR PRE-FUEL (BEFORE DELIVERY) TESTING <br /> 3.1.7 DEFLECTION OF ALL STRUCTURAL MEMBERS SHALL BE LIMITED TO SPAN/180 FOR L.L. ONLY. <br /> co <br /> 3.2.10 SUPPORTING COLUMNS SHALL BE PLACED AS PER 7-ELEVEN, INC. FUEL PLANS AND AS PER -THE TANKS, PIPING AND DISPENSERS MUST BE ACCESSIBLE TO INCLUDE ASPHALT AND CONCRETE THAT CAN BE DRIVEN <br /> 3.1.8 ATTACH DECK STRUCTURAL SUPPORTS PER ENGINEERED DRAWINGS. APPLICABLE SITE PLAN. UPON. <br /> - 110 VOLT AC CURRENT MUST BE AVAILABLE <br /> 3.1.9 ROOF DECK SHALL BE AN I.C.B.O. APPROVED DIAPHRAGM DECK AND ATTACHED IN A MANNER THAT 3.2.11 CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. -ALL PRODUCT PIPING, TANK SUMP, SPILL BUCKET AND DISPENSER SUMP/LINER WORK MUST BE COMPLETE AND <br /> COULD BE CONSIDERED A DIAPHRAGM. AN ALTERNATE TO THIS IS 1/2" DIAMETER STEEL ROD COMPONENTS ACCESSIBLE, <br /> DIAGONAL X-BRACING WITH TURNBUCKLES. LAYOUT OF ROD BRACING AND CONNECTIONS TO 3.2.12 ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL BE FLAT, TRUE TO - TEST VALVES MUST BE INSTALLED FOR THE SECONDARY PRODUCT PIPING. <br /> STRUCTURAL MEMBERS SHALL BE APPROVED BY STRUCTURAL ENGINEER, ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL WALLS CORRECT AND - DISPENSERS DO NOT NEED TO BE IN PLACE AND PRODUCT PIPING DOES NOT NEED TO BE PURGED. <br /> ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. ALL INTERSECTIONS SHALL BE -AS AN OPTION TO SIGNIFICANTLY REDUCE TIME ON SITE, THE CONTRACTOR SHOULD FLOOD ALL TANK SUMPS AND <br /> 3.1.10 CONCRETE FOOTINGS SHALL BE MADE WITH STONE AGGREGATE AND SHALL HAVE A COMPRESSIVE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE LEFT IN ACCEPTABLE CONDITION TO BE DISPENSER SUMPS WITH CLEAN WATER THE NIGHT BEFORE THE SCHEDULED TESTING. WATER MUST BE ADDED TO A <br /> STRENGTH TO A MINIMUM 3000 LBS. PER SQUARE INCH WITHIN 28 DAYS AFTER POURING. PAINTED BY OTHERS. ALL METAL SHALL BE FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL MINIMUM OF 3 INCHES ABOVE THE HIGHEST PENETRATION OR SEAM IN THE SUMP OR PAN. ; <br /> PAINTING/FINISHING. THE CONTRACTOR SHOULD ALLOW SEVERAL HOURS TO ALLOW THE WATER LEVEL TO STABILIZE AND MARK THE LEVEL OF <br /> 3.1.11 ALL FOUNDATION METAL REINFORCEMENT SHALL BE OF FORMED TYPE BARS (EXCEPT#2 BARS)AND THE WATER WITH A PERMANENT MARKER. 0 <br /> SHALL CONFORM TO THE REQUIREMENTS OF THE "STANDARD SPECIFICATION A.S.T.M. 615 GRADE 4 3.2.13 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR NON-SHRINK GROUT BENEATH BASE PLATE Ed <br /> 40". AND POURING OF CONCRETE AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE POST FUEL TEST -TEST PERFORMED AFTER FUEL IS INTRODUCED OR DELIVERED INTO THE UST SYSTEM. <br /> REQUIRED. <br /> 3.1.12 THE SHOP DRAWINGS SHALL EXPLICITLY SHOW LOCATION OF DOWN SPOUTS, INTERIOR PVC DRAINS POST-FUEL TEST ESTIMATED TEST DURATION <br /> IN WARM WEATHER AREAS, ETC., AS RELATED TO ANY AND ALL UTILITIES AND/OR PIPING AT COLUMN 3.2.14 CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF DEBRIS, PRIMED <br /> LOCATIONS. ROOF DRAINS AND LEADERS SHALL BE DIRECTED DOWN THE INTERIOR CANOPY AND READY FOR FINAL PAINTING BY FUEL CONTRACTOR. <br /> COLUMN EXITING SIDE OF ISLAND LEVEL OR ABOVE FINISH GRADE OF CONCRETE SIDE PAD ON --- <br /> TANK INTERSTICE MINIMUM 1 HOUR PER TANK <br /> DOWNHILL SIDE OF ISLAND. 3.3 RESPONSIBILITIES OF FUEL CONTRACTOR: TANK PRIMARY TIGHTNESS MINIMUM 2 1/2 HOURS r'' <br /> LINE/PIPE INTERSTICE MINIMUM 1 HOUR PER LINE/PIPE w <br /> 3.1.13 INCLUDE IN DESIGN PROVISION FOR OVERFLOW DEVICE AT OPPOSITE CORNERS OF CANOPY. 3.3.1 SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN SITE WILL BE LINE PRIMARY TIGHTNESS COMPLETED DURING TANK TEST zz <br /> READY FOR INSTALLATION OF GASOLINE CANOPY, LINE LEAK DETECTOR COMPLETED DURING TANK TEST " f' <br /> 3.1.14 CONSTRUCTION NOT SPECIFICALLY INDICATED SHALL BE ACCOMPLISHED PER MINIMUM STAGE II WHERE APPLICABLE MINIMUM 3 HOURS X <br /> REQUIREMENTS OF THE UNIFORM BUILDING CODE, LATEST EDITION. 3.3.2 UPON AGREED DATE BETWEEN FUEL CONTRACTOR AND CANOPY CONTRACTOR, THE SITE *AUTOMATIC TANK GAUGE ATG CERTIFICATION MINIMUM 2 HOURS n a, <br /> OTHER AS REQUIRED BY STATE OR LOCAL ORDINANCE UNKNOWN z ` Y <br /> SHALL BE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND IN PROPER CONDITION w <br /> 3.1.15 IF THERE ARE ANY CONFLICTS BETWEEN LINES ON DRAWINGS AND GENERAL NOTES OR WITH FOR CANOPY INSTALLATION. FUEL CONTRACTOR SHALL PERFORM SITE WORK AS ui <br /> SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS GOVERN. MAY BE REQUIRED TO COMPLY. <br /> "DOES NOT INCLUDE NEW AUTOMATIC TANK GAUGE (ATG) INSTALLATION. CERTIFICATION OF NEW ATG IS THE RESPONSIBILITY 0 " <br /> 3.1.16 ANY DEVIATION FROM THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY 7-ELEVEN, INC.'S 3.3.3 FUEL CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY ERECTION, OF THE INSTALLING CONTRACTOR. MOM <br /> CONSTRUCTION REPRESENTATIVE. UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY CONTRACTOR AND FUEL <br /> �N <br /> CONTRACTOR. NOTE: WATER USED TO PERFORM TESTING OF (STP) SUMPS, DISPENSER SUMPS AND/OR SPILL BUCKETS, AFTER FUEL IS <br /> 3.1.17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE A MINIMUM INTRODUCED/DELIVERED INTO THE UST SYSTEM CANNOT BE DISCHARGED ON SITE. U <br /> OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK SHALL COMMENCE PRIOR TO 3.3.4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY FOOTINGS AS Fir i <br /> APPROVAL OF DRAWINGS BY 7-ELEVEN, INC.'S CONSTRUCTION REPRESENTATIVE. DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, PROVIDING ALL STEEL, ETC., <br /> (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE PROVIDED BY CANOPY CONTRACTOR). FOOTINGS <br /> SHALL BE POURED IN A SUFFICIENT AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED. WATER THAT IS OR WAS IN CONTACT WITH FUEL MUST BE PROPERLY DISCHARGED IN ACCORDANCE WITH APPLICABLE FEDERAL <br /> STATE AND/OR LOCAL REGULATIONS. _ Q <br /> 3.3.5 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND TRIM AS L 00 <br /> W 00 J <br /> RELATED TO THE GASOLINE CANOPY AS PER 7-ELEVEN STORE STANDARDS MANUAL. CONTRACTOR PREPARATION FOR POST-FUEL (AFTER DELIVERY) TESTING H- �j Z H <br /> 00 o <br /> 3.3.6 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION OF LIGHTS, - THE FUEL LEVEL MUST BE BETWEEN 70-80 PERCENT OF TANK CAPACITY Q z O <br /> SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL GASOLINE INSTALLATION. G.C. - COMPARTMENTALIZED TANKS MUST HAVE FUEL LEVELS WITHIN 10" OF EACH OTHER. W <br /> SHALL CAULK SEAL ALL LIGHT FIXTURES TO CANOPY DECK. Q 00 <br /> ALL FUELING INCLUSIVE OF STAGE I AND STAGE II VAPOR RECOVERY AREAS THE FOLLOWING CONDITIONS MUST APPLY. m a <br /> 3.3.7 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCK OUTS AS MAY BY REQUIRED V <br /> FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS. AND PLACEMENT OF - ALL PRODUCT PIPING MUST BE THOROUGHLY PURGED OF AIR AND VAPORS. �# Qj <br /> ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED THERETO. - THE DISPENSERS MUST BE SET AND OPERATIONAL TO INCLUDE ALL VAPOR VACUUM PUMPS AND OTHER STAGE II p U (Zcc L <br /> EQUIPMENT FULLY FUNCTIONAL. REPLACE FILTER AFTER PURGING. __3 07 0 0 U <br /> 3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY INSTALLATION FOR A MINIMUM - ALL HANGING HARDWARE MUST BE INSTALLED AND OPERATIONAL <br /> PERIOD OF 2 YEARS. A 5 YEAR WARRANTY GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATION - THE TANKS, PIPING AND DISPENSERS MUST BE ACCESSIBLE TO INCLUDE ASPHALT AND CONCRETE THAT CAN BE DRIVEN -oo o > ami c c c- 0. <br /> DEFECTS. EXCLUDING ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR. UPON. C) m T 0 c m N` N Q o <br /> -110 VOLT AC CURRENT MUST BE AVAILABLE <br /> 3.5 CLEAN-UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL FROM SITE ALL TRASH AND TEST VALVES MUST BE INSTALLED FOR THE SECONDARY PRODUCT PIPING, o.o y = 0000.0_66@- 0-s <br /> DEBRIS RESULTING FROM WORK RELATING TO INSTALLATION OF CANOPY. �� o cc o c , <br /> CONTRACTOR NOTIFICATION TO TESTING COMPANY (TANKNOLOGY): m m.ar a o w s t m N.`00E <br /> ao ao x o a@ c ICD <br /> v <br /> IT IS RECOMMENDED THAT THE CONTRACTOR PROVIDE NOTIFICATION TO TANKNOLOGY OF THE NEED TO PERFORM TESTS AT c 0 N 11 u a c o E m <br /> LEASE 14 DAYS PRIOR TO THE ANTICIPATION TEST DATE. HOWEVER, TO ENSURE TESTS ARE CONDUCTED IN A TIMELY MANNER A a o s ¢.o, C y w o <br /> MINIMUM OF FIVE (5) DAYS IS REQUIRED. TANKNOLOGY UNDERSTANDS THAT ACTUAL DATE MAY CHANGE, BY PROVIDING THEM �.N o m~v <br /> WITH AS MUCH TIME AS POSSIBLE ALLOWING THEM TO MAINTAIN A TIME SLOT IN THEIR SCHEDULE TO SHIFT AS NECESSARY. THE o 0 Td) m ` ° a u°o 0 <br /> o � p3 �L� � <br /> 0 <br /> CONTRACTOR MUST KEEP TANKNOLOGY APPRISED OF THE ANTICIPATED DATE AND TIME THAT THE TESTING WILL BE NEEDED AS E o n <br /> PROJECTED DATES CHANGE. C� <br /> L <br /> OFESS <br /> < n <br /> lop <br /> ... 35558 <br /> A CHAt1O <br /> P ASO <br /> 11/26/18 <br /> SHEET: <br /> G17 . 0 <br /> FUELING - USA <br />