My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br /> -- --- --- -Tim-- --- --- <br /> __ ......... ,._.. _ STORE GE <br /> Z <br /> NERAL CONTRACTOR � <br /> 11r � �� NEW FIRE HYDRANT 1 STORE GC TO WORK WITH FUEL GC ON <br /> \< <br /> t <br /> O <br /> SCHEDULING. ANY CONFLICTS SHALL BE c U H <br /> BROUGHT TO THE ATTENTION OF THE SEI Z <br /> 11 PROJECT MANAGER. W_ c� <br /> :T] <br /> LU <br /> UNDERGROUND ELECTRICAL CONDUITS TO (10) FT U <br /> ' 12 STORE ELECTRICAL CONTRACTOR TO RUN O <br /> OUTSIDE OF BUILDING SLAB COORDINATE W <br /> LOCATION, QUANTITY, SIZE AND TYPE OF CONDUIT W <br /> 7-ELEVEN <br /> JI, WITH FUEL CONTRACTOR). d U <br /> I I i <br /> 00 o° <br /> STORE3 STORE ELECTRICAL CONTRACTOR TO INSTALL w p j <br /> \ 1❑ SEAL-OFFS (AS REQUIRED), ELECTRICAL p N o <br /> RACEWAYS, GUTTER BOXES, FUEL ELECTRICAL <br /> o � <br /> PANELS, CIRCUIT BREAKERS AND FEEDERS. <br /> h ' 1 <br /> \ 4 STORE ELECTRICAL CONTRACTOR TO INSTALL ami <br /> ' 6 OVERHEAD CONDUIT FOR VEEDER ROOT FROM <br /> ELECTRICAL ROOM TO LOCATION OF V/R ON Proto 08-21-17 <br /> PLANS. <br /> Li <br /> 5 STORE GC RESPONSIBLE FOR ALL EXTERIOR <br /> AREA LIGHTING, IRRIGATION AND AIR/VACUUM <br /> I � <br /> ' UNIT SLAB AND POWER. <br /> i y <br /> I <br /> 5'- i i ( i 6 MONUMENT POLE SIGN TO BE PROVIDED AND ( Z <br /> INSTALLED BY SIGNAGE CONTRACTOR. THE SIGN L Q <br /> \ I IS TO BE FUTURE MEDIA ELECTRONIC PRICE SIGN. r-- a <br /> Lu® FUEL CONTRACTOR <br /> W Lo 2 <br /> 1 FUEL GC TO WORK WITH STORE GC ON U ~ I j O <br /> SCHEDULING. ANY CONFLICTS SHALL BE z Z W (V <br /> BROUGHT TO THE ATTENTION OF THE SEI - - of W <br /> ' PROJECT MANAGER. > Of Q <br /> 3 <br /> 2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER W p W U (� <br /> 11> <br /> TANKS AND PRODUCT PIPING (I.E.TANK SLAB AND > O Z W <br /> STORE CONTRACTOR RESPONSIBLE DRIVE MATS). CONCRETE CHAIRS ARE BY F- <br /> FOR ROUTING (29)3/4"AND (3) 1" SEL W W ~ _ <br /> ' ROBROY PVC COATED GALVANIZED J > U <br /> U <br /> - , STEEL CONDUITS (WITH PULL STRING) 3 FUEL GC RESPONSIBLE FOR CANOPY FOOTINGS. W r <br /> i FROM ELECTRICAL ROOM 152 cm (5') I W CV Q <br /> PAST THE FRONT SIDEWALK. FUELING - 4 FUEL GC TO INSTALL CANOPY DRAINS (WHERE m i <br /> i CONTRACTOR TO PICK UP CONDUITS AT APPLICABLE)TO POINT OF CONNECTION WITHIN Z <br /> THIS LOCATION AND ROUTE TO FINAL (10) FT OF DRIVE MATS. _ J <br /> ' TERMINATION. FUELING CONTRACTOR <br /> RESPONSIBLE FOR PULLING WIRE AND 5 FUEL EC TO INSTALL ALL FUEL RELATED O W <br /> MAKING FINAL TERMINATIONS. REF ELECTRONICS (I.E. DATA BOXES, EDH UNIT, N LCL <br /> i G16.0 FOR SPECIFICATIONS. TURBINE RELAYS, ISOLATION RELAYS, ETC). <br /> I � I <br /> 6 FUEL GC RESPONSIBLE FOR ALL ELECTRICAL <br /> Fil <br /> 14.15 14.15 14.15 CONDUITS, SEAL-OFFS, ELECTRICAL J-BOXES PER <br /> 13.84 STATE, LOCAL, MANUFACTURERS AND SEI CODES <br /> AND SPECIFICATIONS. <br /> El <br /> ' 5 7 FUEL EC TO PULL WIRE FOR CANOPY LIGHTING, <br /> r �F' INTERCOM, DISPENSERS, TURBINES AND <br /> € II II LJ 14.33 : <br /> MONITORING SYSTEM DEVICES. <br /> 1 99 <br /> 13.68 <br /> 13.65 --_-_______ __________ 8 FUEL EC TO MAKE ALL FINAL CONNECTIONS TO <br /> FUELING EQUIPMENT AND ELECTRONICS. <br /> 13.59 2 U U ' 4 7 O 9 FUEL GC TO PULL TRADE PERMITS FOR FUELING <br /> p ° I I °0 I ° ° I ° ° C WORK (AS REQUIRED). <br /> _ II L L L _ y 10 FUEL GC TO "CALL FOR"AND "BE PRESENT FOR" <br /> 10 ALL LOCAL REGULATOR INSPECTIONS AND <br /> 13.42 L _ _°_ ° _ _ - _ _ _ _ _ _ _ ° _°_ _ J RESPONSIBLE FOR SCHEDULING ON-SITE <br /> INSPECTIONS WITH APPROPRIATE SEI <br /> 13.39 3 13.86 14.15 14.15 14.15 <br /> REPRESENTATIVE RELATED TO FUELING. <br /> 13.86 11 FUEL GC TO COORDINATE WITH TANKNOLOGY w <br /> z w <br /> AND THE SEI CONSTRUCTION MANAGER FOR n g <br /> TESTING OF FUELING SYSTEM. o c <br /> ,. .. 100'_0" <br /> 12 FUEL GC TO HAVE PERSONNEL ON SITE FOR z E <br /> (10 <br /> TESTING. z <br /> 13 FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGE z o <br /> € PER 7-11 MATRIX. LE <br /> 6 s <br /> ® KEY NOTES o <br /> 3, 1� 7-ELEVEN CONVENIENCE STORE <br /> ,�\�\\ <br /> F2 FUELING CANOPY AND DISPENSERS <br /> 3❑ UNDERGROUND FUEL STORAGE TANKS AND SLAB r <br /> Lo 00 C9 2 <br /> ® FUEL STORAGE TANK VENTS Oi j Z H <br /> r <br /> i I .: 0 ® Q !, € } Q AIR-VAC MACHINE Z O <br /> 00 <br /> 4 JI A <br /> V � <br /> ' � © EMERGENCY SHUT OFF SWITCH, Q m <br /> REF 2-G10.0 >+ <br /> ........... _.............. VAPOR POLISHER <br /> Y <br /> m <br /> r------------------- - <br /> ® PYLON SIGN O U (a L <br /> ❑9 VEEDER ROOT SITE MONITOR CONSOLE <br /> (FIELD VERIFY) °° y o <br /> REF 4-G6 0 SHUT OF SWITCH ON BOLLARD Loo x E'er <br /> 10 CL <br /> EMERGENCY <br /> I I 2 o o" dp w"-o @ <br /> 11 MONUMENT SIGN m m aL c o w L c m y <br /> c M <br /> aa�2 a 345.5 <br /> `oai ° ° @ `°.- <br /> o 3« cam •-o <br /> 1 I ! TANK BURIAL CHART -STORE (38153) c ° y w m o @ <br /> ------_ �i I (¢.o -00 a) E <br /> COMPONENT REMIU VAPOR VENT E ° ° ��am N <br /> I P M °.� o o °,_ . <br /> I A. FINISH GRADE ELEV. AT BEGINNING OF RUN (FT): 14.15 14.15 14.33 0 r > a0i � a ac y o <br /> L -----J B. PIPE BURY (FT): 2.00 0 o ° O r ° N@ L E <br /> m ..... <br /> 2.00 2.00 p ° O'�t <br /> �, <br /> 8 C. ELEVATION OF PIPE AT BEGINNING OF RUN (A-B) 2 15 - ° r <br /> i 1 12.15 12.33 3 <br /> \ \ D. PIPE LENGTH /LONGEST RUN) (FT): 103 97 139 <br /> \, NEW FIRE HYDRANT <br /> - E. PIPING RUN FALL FT D*1/8" PER FT : <br /> \>.. _________. <br /> -- _........_ . ..._......__ _ i.__._. ..._..._ _. __ _........................_-..._ _.... � _ � ( ) ( ) 1.07 <br /> 1.01 1.45 a � <br /> F. TOTAL CROSSOVERS/SWING JOINTS: 1 1 0 a <br /> (FT): <br /> 1.00 1.00 0.00 czs' ., ,a.. <br /> G. CROSSOVER/SWING JOINT DEPTH <br /> o? <br /> _._ t <br /> _._._. H. <br /> b E <br /> .. �_.._..._._._..__..._..._........._ .............. .. . ......... _._.. ........ ,... ,. LEVATION AT END OF - - ct .. <br /> PIPE (FT) (CEG). 10.08 10.14 10.88 <br /> .... ._._..... _ ........ ...,. I. ADD FOR EXTRACTOR TEE AT SUMP: 1.00 1.00 1.50 <br /> J. TOP TANK ELEVATION (FT) (H-1): 9.08 9.14 9.38yRA10 <br /> K. HIGHEST FINISH GRADE ELEVATION AT TANK SLAB (FT): 13.86 13.86 13.86 E C,, <br /> L. MAX BURY DEPTH (K-J) (FT): MAX= 5.67' 4.78 4.72 4.48 11/26/18 <br /> A R C H I TE C TU R A L SITE PLAN M. LOWEST FINISH GRADE ELEVATION AT TANKS (FT): 13.39 13.39 13.39 SHEET: <br /> (D- 3/32" = 1'-0" N. MIN BURY DEPTH (M-J) (FT): MIN = 4.17' 4.31 4.25 4.01 <br /> TANK BURIAL DEPTH IS GOVERNED BY PREMIUM PRODUCT PIPING TO DISPENSER 1. G 0 , 1 <br /> THE TOP OF TANKS SHALL BE SET AT- 9.08'. <br /> FUELING - USACA <br />
The URL can be used to link to this page
Your browser does not support the video tag.