My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> 21. A"Certification of Installation / Modification" form for installed tanks shall be submitted into CERS by the <br /> owner or the owners' agent [pursuant to California Code of Regulation (CCR) 2635(d)] before this UST <br /> installation will be considered complete by the EHD. <br /> 22. An accurate and drawn to scale as-built drawing(s), which indicate the location of the underground storage <br /> tanks (underground storage tank, piping, auxiliary and monitoring equipment) with respect to buildings or <br /> other landmarks (per 23 CCR 16 2711(8)) and copies of any required installation checklists (tank <br /> installation, etc.) must be submitted to the EHD prior to scheduling the final inspection. <br /> 23. Designated Operator (DO) training requirement (per 23 CCR 16 2715(c)) must be satisfied prior to <br /> scheduling the final inspection. <br /> 24. Valid BOE must be obtained and provided to EHD after tank installation and prior to fuel drop and must be <br /> uploaded into the California Environmental Reporting System (CERS) prior to scheduling the final <br /> inspection. <br /> 25. Hazardous material or waste cannot be released(intentionally or unintentionally)to the sewer/septic, storm <br /> water system, or any other waters of the state. If a release occurs it will be considered illegal hazardous <br /> waste disposal and will be subject to enforcement. <br /> 26. Submit to CERS all applicable hazardous materials, hazardous waste and UST submittals. This submittal <br /> must be approved by the EHD prior to scheduling the final inspection. <br /> 27. Passing Enhanced Leak Detection (ELD) results must be received by the EHD prior to receiving fuel. <br /> 28. All outstanding up-to-date permit fees must be paid prior to receiving the final approval to operate. <br /> 29. This permit expires at the end of the calendar year, but can be extended for another calendar year upon a <br /> written request to the EHD. A request for extension to this permit must be received by December 31, 2019. <br /> If you have any further questions, please contact me at(209) 953-7699 <br /> Thank you, <br /> lanElena zo, Lead Sr. REHS <br /> CC: VR Walker Corp, P.O. Box 52427, Atlanta, GA 30355 <br /> 7-Eleven, 4637 Chabot D., Suite 117, Pleasanton, CA 94588 <br /> 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.