My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br /> 36'-2" O.T.O. TANK SLAB U) <br /> 1- <br /> 32'-2" 1 ALL CONSTRUCTION SHALL MEET COUNTY Z <br /> W <br /> (MIN BOUNDARY TOP OF EXCAVATION) STANDARDS. CONTRACTOR TO SECURE ENTIRE :F <br /> 281-2" CONSTRUCTION AREA WITH CHAIN LINK 2 <br /> (MIN BOUNDARY BTM OF EXCAVATION) FENCING DURING CONSTRUCTION PERIOD. O U) <br /> r � <br /> 8c Calceclati0ns; Brine Filled Tanks 71 <br /> o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2 THE CONTRACTOR SHALL IMMEDIATELY NOTIFY W <br /> Ass a1Jors <br /> F (7 ENGINEER OF ANY DIFFERENCES BETWEEN THE <br /> W <br /> suraberrf ksa 2 ate 62IF <br /> cf I I B1 , I ACTUAL FIELD CONDITIONS AND THE PLANS W 0 <br /> Tank Dr, "eagl t. 133L4? firs Submerged Concrete 8 I I BEFORE PROCEEDING WITH CONSTRUCTION. 0 � U <br /> 7 t lblcf <br /> Volume of Tank: 2LCk0�galls ns Submere���d re i - 7.6 itaf`cf <br /> I 8 3 FUEL CONTRACTOR SHALL BE RESPONSIBLE W - <br /> Tank Dlarneter. TO ft IM I FOR THE INTEGRITY OF THE PIPING SYSTE B- U <br /> 72 <br /> Tank Burial Depth; 4. � I I DURING CANOPY ERECTION AND CONCRETE <br /> Tank Length: 3735 <br /> I FLATWORK w w <br /> INSTALLATION.I I I I <br /> p No <br /> 04 AFTER COMPLETING INSTALLATION OF <br /> of Sump N <br /> v o <br /> O O I II <br /> DISPENSERS, THE FUEL CONTRACTOR IS TO p <br /> �����'i3'aCYke��2r. 42 inches �rns�arcl Frees q0 INSTALL BRIGHT ORANGE CONSTRUCTION �* <br /> Slab Le ha <br /> S a6�V; 5Z.Y713 F 120200,2 Ikis Concrete Slap <br /> a .17 #t FSR 224233.7 lbs Backfill ¢ ¢ <br /> U U <br /> 3-63.61FENCE AROUND ENTIRE DISPENSER. <br /> Si@bT , <br /> hl.ck lass: B rnehes F5 17491'1,23 lbs Gravel above Dearlma ¢ w w I I I I 19 20 5 FUEL CONTRACTOR IS TO BE AWARE THAT ON � <br /> co LL � I ®� I I THE DAY THE GASOLINE SYSTEM IS PUT INTO Proto 08-21-17 <br /> Deadman Length: 36 in F6 26323'93 lbs SaI! above DearOm'at Y O O I I I 28 DSL SERVICE, THE FUEL CONTRACTOR AND A <br /> Headman kV8dal3; 1E inches F7 13797 (( c z IL g <br /> (an rete Deadman ¢2600 <br /> Deadnlatl HIe�llit 3:75 inchesO I- I 56 GILBARCO AUTHORIZED SERVICE CONTRACTOR <br /> F'L`$ m <br /> Tank Dry weight ~ ~ m I MUST BE ON SITE ONE (1) HOUR PRIOR TO <br /> 18s p I I 41 <br /> Total Down STARTUP AND MUST REMAIN ON SITE THREE (3) <br /> X 9,7 lf�s � ¢ ¢ <br /> L3pwJard Forces: �� O o p I I I 99 PO ADDITIONAL HOURS FOR A TOTAL OF FOUR (4) <br /> Z z I I I HOURS.ANY COSTS INCURRED OVER FOUR(4) M <br /> N HOURS DUE TO FUELING SYSTEM ISSUES, o <br /> F1 33.32 bs Tank ,,� m m <br /> `2 0.34 lbs Sump z z I I O I I 26 RUL SHOULD BE BILLED AS A CHANGE ORDER. ^ Z <br /> � Q � Q <br /> T�tiUp SSss,2is I <br /> LM Y <br /> I I I O 27 PUL U <br /> a W O <br /> a.L�, �1��q €\ <br /> Sum 4rC5211985.5 lbs of d04+Jntisaru force p �� 43 Q <br /> c W <br /> II ° ® KEY NOTES Z ; � M <br /> or of Safe , , 1.fiC6 s i<2 Q <br /> I I U) <br /> Ir Q <br /> i i I w Q wz Q <br /> //3 A/ I B1 I I 8 6" CONCRETE SLAB AT FUELING CANOPY. > O z 0 <br /> L REF 1-GO.1 AND CIVIL DRAWINGS FOR TOS LU W ~ Z <br /> - - - - - - - - J ELEVATIONS. J U) <br /> L Q2 GEOTECH FABRIC MATERIAL TO EXTEND 12" 1 W 0 <br /> PAST EACH SIDE OF PIPING TRENCH AND TANK I` In i Z <br /> EXCAVATION. <br /> U .I <br /> NOTE: �3 PIPING TRENCHES SHALL BE DUG IN SUCH A 2 Z ) <br /> FOR REINFORCING AT TANK 8"TANK SLAB 6" CANOPY MANNER THAT THE TRENCH WIDTH IS EQUAL TO o0 LL <br /> SLAB PENETRATIONS AND LL <br /> SLAB AT LEAST TWICE WIDTH OF ALL PIPING N <br /> CORNERS REF 6-G6.1 CONTAINED WITHIN. MAINTAIN A MINIMUM OF 4" co <br /> (10cm) CLEAR DISTANCE BETWEEN PIPING <br /> POSITIONED IN THE TRENCH AND 6"WHERE <br /> PIPING CROSSES OVER EACH OTHER. THE <br /> TANKSAB PLAN BOTTOM OF THE TRENCH SHALL 2 AS UNIFORM AS POSSIBLE TO ELIMINATE HIGH <br /> NOTE: <br /> SPOTS AND ENSURING AN EVEN LAYER OF <br /> 1�8°=1'-0° <br /> APPROVAL FROM THE FIRE DEPARTMENT, CITY OF STOCKTBEDDING MATERIAL UNDER THE PIPE. REMOVE <br /> SHALL BE ALL SHARP ROCKS AND DEBRIS FROM THE <br /> NEEDED PRIOR TO INSTALLING THE UNDERGROUND FUEL STORAGE <br /> RAGE TRENCH BOTTOM BEFORE BEDDING MATERIAL <br /> TANKS, FUEL DISPENSERS, AND ASSOCIATED EQUIPMENT AND PIPING, IS INSTALLED. <br /> ® SITE CONDITIONS MAY CAUSE VARIATIONS <br /> WHICH MUST BE APPROVED BY 7-ELEVEN AND <br /> MANUFACTURER. PIPING BURIAL DEPTHS LESS <br /> THAN 18" REQUIRES 7-ELEVEN APPROVAL. h <br /> FLOW RATE FLOW RATE <br /> (RUL AND PUL) (DSL) <br /> 1-6 NOZZLES - 10 GPM 1-4 NOZZLES - 10 GPM <br /> 3"X 2" REDUCER 8 NOZZLES - 9.8 GPM zu <br /> BUSHING (6 LOC) 10 NOZZLES - 8.5 GPM STORE SIDE 101 <br /> M <br /> REF 5-G5.0 <br /> z <br /> TANK#1 STP SUMP (RUL) w <br /> REF 4-G6.1 AND 1-G4.0 TANK#1 12 NOZZLES - 7.5 GPM Q ` <br /> W v <br /> TANK#3 <br /> INTERSTITIAL MONITOR 10 FT DIA 10 FT DIA 3" OVER 2" DBL-WALL <br /> REF 5-G6.1 AND 4-G3.0 12,000 GAL 20,000 GAL TEE IS SET AT <br /> FIBERGLASS PRODUCT f:+r <br /> TANK#3 STP SUMP (DIESEL) DIESEL REGULAR 45°ANGLE, TYP PIPING-SLOPE 1/8" PER 37. <br /> DISPENSER <br /> REF 4-G6.1 AND 2-G4.0 REF 2-G3.0 UNLEADED FOOT MIN STATION 0 z °o <br /> REF -G3.0jA <br /> ID TYPICAL f;:' I c <br /> 3" OVER 2" DBL WALL FIBERGLASS CHASE *\ <br /> PIPING BETWEEN TANK SUMPS TYPICAL <br /> REF 1-G12.1 0 10 O 170 f-O O 7170 (� 1 7170 0 - <br /> TANK#3 DIESEL FILL SUMP n <br /> REF 1-G5.0 �- REF 1-G5.0 REFI-G5.0 WRAPPED CANOPY COLUMN TYPICAL \\\; <br /> REF 4-G6.1 AND 2-G4.1 I SIDE 1 � SIDE 1 REF SHEET G8.0 AND <br /> oDISP 50 SIDE 1 CANOPY MFR DRAWINGS <br /> 1 1 I o DISP 3 oDISP 10 <br /> � 11 I o rte, 0 1 I 90° ELBOW IS SET AT � <br /> ' I - I � 45°ANGLE, TYP L j ( S <br /> 12 I LSI w O W � o -I <br /> 0 Q 0 Z ~ <br /> o <br /> - - - - - - - - - - - o Z <br /> 1 REMOTE Q <br /> �� > m <br /> 1 III II I �_ G6.0 VENT <br /> O m N <br /> I 1 12" MIN C 1 <br /> OQ } } VAPOR POLISHER TYPICAL 3 1 2 p CO (cc6 <br /> o <br /> f i 0 0 0 0 3" OVER 2" DBL-WALL FIBERGLASS REF 1-G6.0 4 . a <br /> III 12 11 OS O7 �4 O3 VENT PIPING - SLOPE FROM a = s <br /> TANK#2 STP SUMP PUL -y O ' 71 7170 7171 a ' • a. A ` a ° ami a a a-Oi o c(PUL) <br /> REF 1-G5.0 REMOTE VENT DOWN TO TANKS a'. s j m N@ N 3 Lm 3 0.0 REF 4-G6.1 AND 1-G4.0 - REF 1-G5.0 REF 1-G5.0 1/8" PER FOOT MIN _z F a,' L ° c o., y °- <br /> >'-0600 <br /> 0 <br /> >'-0 6 0 O-E-� a D °-° <br /> PEA GRAVEL BACKFILL TYP -0 o o.L-- c m X'p N-Z-o 0 m <br /> TANK#2 FILL/VAPOR SUMP PUL DISP 4 D DISP 2 °' (OR APPROVED ALTERNATE) a .0 0 m c ° o <br /> (PUL) o SIDE 1�-DISP 6 SIDE 1 SIDE 1 o O 02 Q° 3 3:~ 3-0 c E <br /> REF 4-G6.1 AND 1-G4.1 0 0 <br /> TANK#2 Lo' 00) X 0 Oia ,� ° <br /> TANK#1 FILL/VAPOR SUMP RUL 03 a° ° ° m <br /> (RUL) 10 FT DIA 4"OVER 3" DBL-WALL n O aY r� a).-'- E <br /> REF 4-G6.1 AND 1-G4.1 3" OVER 2" DBL-WALL c a 0 ° 3 N o ° O E <br /> 8,000 GAL FIBERGLASS MAIN TRUNK TYP 0 01 ADD 10 INCHES OF WIDTH O c r °¢- N.O O <br /> FIBERGLASS ® ® TO PIPING TRENCH FOR E w ,O ar o o <br /> INTERSTITIAL MONITOR PREMIUM LINE VAPOR PIPING - REF 2-G6.0 VAPOR PIPING - SLOPE 1/8" 02 EACH ADDITIONAL PIPE v <br /> UNLEADED SLOPE 1/8" PER FOOT MIN PER FOOT MIN. TRANSITION z ° ° C r O o 1 w r <br /> REF 5-G6.1 AND <br /> Q1 �� ° `�_N OO C N E <br /> 4- 3.0 ° c 3 <br /> REF 2-G3.0 TO 4" OVER 3"AT TRUNK LINE L <br /> 10" 10,11 102" F OFESS/ <br /> NOTE: PIPING DESIGN BASED ON 25' LENGTHS � ry <br /> REF 1-G6.1 FOR DIMENSIONS AND <br /> LOCATIONS OF DISPENSERS. <br /> (4 PIPE)48"WIDE TRENCH <br /> STREET SIDE (3 PIPE) 36"WIDE TRENCH <br /> 35558 <br /> (2 PIPE)26"WIDE TRENCH <br /> 16"WIDE TRENCHOF CAS <br /> (1 PIPE) 11/26/18 <br /> UES PIPING PIAN PIPING TRENCH SECTION SHEET: <br /> O <br /> FUELING - USA CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.