My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN I O A O U I N Environmental Health Department <br /> —COUNT�JYV—I, <br /> E. UNDERGROUND STORAGE TANK(S): <br /> TANK# # 1 # 2 # 3 # # <br /> CAPACITY 20,000 gal. 8,000 gal. 12,000 <br /> MANUFACTURER Xerxes Xerxes Xerxes <br /> MODEL DW DW DW <br /> COMPOSITION FRP FRP FRP <br /> PRODUCT gasoline gasoline diesel <br /> Check code <br /> BOX section <br /> Hsc <br /> ®0 2529900. <br /> 252901 c 11 c 1 Tank(s)compatible with the substance to be stoned. <br /> 23 CCR» Design and construction of tank(s)and all other components used to construct primary <br /> ®p 2631(b) containmentsystem(s)approved by independent testing organization e. . UL). <br /> 23 CCR <br /> ®❑ 2631(x) Secondary Containment Provided for Underground Storage Tanks. <br /> ®� Buoyancy Calculations submitted and signed by a Professional Engineer which <br /> demonstrates a safety factor greater than 1.25. <br /> F. SYSTEM PIPING: <br /> Primary <br /> PIPING MANUFACTURER MODEL COMPOSITION <br /> PRODUCT PIPING NOV Fiberglass Redthread IIA FRP <br /> VAPOR PIPING NOV Fiber ass Redthread IIA FRP <br /> VENT PIPING NOV Fiberglass Redthread IIA FRP <br /> Secondary <br /> PIPING MANUFACTURER MODEL COMPOSITION <br /> PRODUCT PIPING NOV Fiberglass Redthread IIA FRP <br /> VAPOR PIPING NOV Fiberglass Redthread IIA FRP <br /> VENT PIPING NOV Fibe Redthread IIA FRP <br /> 'HSC-Health and Safety Code Z U` 4 <br /> 23 CCR-Code of Califomia Regulations <br /> s ors <br /> Z` <br />
The URL can be used to link to this page
Your browser does not support the video tag.