Laserfiche WebLink
RE KEY NOTES <br /> F- <br /> F <br /> 10 PAINT VENT PIPES "EXTRA WHITE" SW7006. Z <br /> W <br /> 2 <br /> ❑2 PAINT VENT RACK, BOLLARDS AND ALL OTHER 2 <br /> EXPOSED METALS "SEAL SKIN" SW7675. o O C/) <br /> �3 SUMP SENSOR TO REST AT LOWEST POINT OF Q W <br /> SUMP ENCLOSURE . TANK CONTRACTOR TO c W <br /> SUPPLY ALL BRACKETS AND CLAMPS FOR N W O <br /> 4" STEEL PIPE BOLLARD FILLED 01 <br /> 2-POINT MOUNTING OF THE 2" FRP SLEEVE. 0 U <br /> W/CONCRETE. PARGE TOP <br /> SMOOTH AND PAINT. W <br /> E-STOP MECHANICALLY FASTENED d U <br /> TO BOLLARD. MOUNT 46" MAX. <br /> 2 ABOVE PAVEMENT TO BUTTON. RO 17 0 N <br /> 45 ro N O <br /> V O <br /> O � <br /> ° U DBaa <br /> 6 <br /> 0 Proto 08-21-17 <br /> D I REFERENCE 1-G1 <br /> Q <br /> PAVEMENT VENT CAPS TO BE FOR ORIENTATION <br /> 12'ABOVE GRADE OF VENT PIPES <br /> M <br /> CD <br /> L0 <br /> ® EXPLOSION PROOF ti <br /> 91 VEEDER ROOT VAPOR POLISHER- <br /> +CONCRETE FOOTING <br /> PER SPECS- 18" DIA JUNCTION BOX BY GC J <br /> CONTRACTOR TO FASTEN TO UNLEADED (� <br /> • VAPOR PIPE PER MANUFACTURERS LU LoQ <br /> SONOTUBE X 36" LONG <br /> INSTALLATION GUIDE U ~ F_ O W <br /> CONCRETE FOOTING • Z Z W Lo ❑ <br /> FOR HOOP BOLLARD NOT 9'-0" HT. ° ° e <br /> SHOWN FOR CLARITY (n Q Q <br /> Z _ � v Q <br /> 1' s° >a0 LU <br /> z 0 Z <br /> BOLLARD FOR E-STOP J V U W Lu <br /> MANIFOLD STEEL <br /> FITTINGS BY GC w x O W <br /> W <br /> i Wco (n O <br /> 4 <br /> EMERGENCY SHUT OFF- SWITCH ON BOLLARD P <br /> 2"VENT RISER PIPING O <br /> 0 <br /> N <br /> M <br /> 1 <br /> 2 <br /> HO o e e o o e <br /> rw <br /> EXPLOSION PROOF amy <br /> S1 JUNCTION BOX BY GC <br /> AIR/VACUUM BY AIR-SERV GROUP, LLC <br /> CONDUIT TO BUILDIN <br /> FOR VAPOR POLISHER <br /> 2" BLACK <br /> IRON CONDUIT TO BUILDING FOR <? <br /> SUMP SENSOR rc <br /> 0 0 o VENT RISER _ <br /> 0 <br /> 07 PIPING <br /> MINIMUM 4000 PSI CONCRETE FOUNDATION <br /> z <br /> w PER MANUFACTURER'S SPECIFICATIONS, n <br /> w W f; <br /> O SEE SPECIFICATIONS FOR SLUMP TEST. , <br /> a ¢ '; <br /> W U) ° ° y a <br /> uiQ U <br /> u . <br /> ° <br /> 0 � Co,nMcnr/waf��i✓ <br /> O EXPLOSION PROOFui <br /> ' <br /> Wz4 0 <br /> ° 06 a d % ! pB/LyS Tyo p�/A JUNCTION BOX BY GC Q „E ' J <br /> W <br /> OZ 90 <br /> u <br /> ° 4 UNISTRUT, U-BOLT AND A4 <br /> a ° e PIPE CLAMP BY GC a Pal <br /> K <br /> v d 2" ID FIBERGLASS TUBE 03 <br /> a III_ TO BE BRACKETED TO UNISTRUT <br /> 0 <br /> II — d 10 Q 00 J <br /> ��� ���� ii��� ���— ° 0 S1 p W I-__ <br /> T GO Z <br /> FRONT 4 ° 03 2" SCHED 40 BLACK Q 0 <br /> 1'-6" Z M <br /> 16 IRON ELBOW BY <br /> GC FRONT <br /> NO TYP 51 SO 2 Q �;, m <br /> NOTE: <br /> MAXIMUM 2 PERCENT GRADE SLOPE EACH WAY SIDE CO <br /> REQUIRED FOR AMERICANS WITH DISABILITIES ACT <br /> C Y <br /> coc <br /> 0 m L <br /> a o <br /> FILL BOLLARD WITH CONIC. <br /> 1. ELECTRICAL NEEDS ARE#10 WIRE (30 AMP)WITH GROUND PARGE TOP SMOOTH AND -0 c <br /> — <br /> ° <br /> PAINT � o <br /> o � <br /> °p <br /> U r � mm � m � co� a Ro <br /> 6,_0., 2 ® >,o a o 0 a E a <br /> ° p > o ,nL0, O <br /> 1'-6" ELECTRICAL STUB-UP WITH HO e a ° o o w e � m 21 N a a <br /> ELECTRICAL WEATHERPROOF BOX w m o o .0 0 ° c 0 �� o N <br /> \ ® \ y is 0 m cN.E <br /> b cua6,0 <br /> 3� ��wy � u cm <br /> M \ \ <br /> W CONCRETE PAVEMENT a a 0 p 0 ( 0 0 m c E o <br /> a U a <br /> O o O2 o _o O'UFw <br /> Z ° ° S ° ° oCOO'DNaa) �� N Oa) <br /> O 0 <br /> g TOP OF GRADE _ <br /> ° d a: . <br /> GC TO PROVIDE CONCRETE SLAB ° ° a' Q ° ° ° ° o mE-E> a O _ <br /> v . ° o Q o 0-C p 3 C� N N L a1 <br /> R AND UTILITIES.AIR SERV TO PROVIDE ro a <br /> EQUIPMENT AND MAKE FINAL CONCRETE FOOTING a o `y <br /> M $ e L <br /> CONNECTIONS. PER SPECS- 18" DIA p <br /> SONOTUBE X 36" LONG 4'-0" MAXt�f SSt <br /> v TYPY <br /> *r <br /> PLAN '.. <br /> CONC CURB - REF CIVIL DRAWINGS <br /> 18" fO C:, <br /> _ FRONT <br /> FRONT <br /> DIA <br /> 11/26/18 <br /> SHEET: <br /> PLAN 699 DIA PIPE <br /> TANK VENT RISER SECTIONS G6 . <br /> IR - VAC MACHINE DETAILS BOARD DETAIL 3/4"=1'-0" <br /> 2 1/2 FUELING - USA CA <br />