My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2800 - Aboveground Petroleum Storage Program
>
PR0528989
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 9:08:39 AM
Creation date
1/17/2019 8:44:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528989
PE
2832
FACILITY_ID
FA0003934
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` , J O 1 Q U I t , Environmental Health Department <br /> SA <br /> -COUNTY-- <br /> i lc/ <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name : Facility Address : Date : <br /> Lawrence Livermore National Lab - Site 300 15999 W CORRAL HOLLOW RD , TRACY November 26 , 2018 <br /> Qualified Facility - Tier II <br /> 501 CFR 112. 6(a) (1 ) , Tier II Qualified Facility Plan not certified by the owner or a PE , as required ❑ V ❑ R ❑ COS <br /> 112 . 6(b) <br /> 502 CFR 112 .6(b) (2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE ❑ V ❑ R ❑ COS <br /> 503 CFR 112 . 6(b)(3) , Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility ❑ V ❑ R ❑ COS <br /> 112.6(b)(4) <br /> 504 CFR 112 . 6(b) (4) ( i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑ V ❑ R ❑ COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112 . 7 Failure of Plan to fulfill basic requirements including a cross-referencing section ❑ V ❑ R ❑ COS <br /> 602 CFR 112 . 7(a)(2) Plan failed to discuss equivalent environmental protection , if applicable ❑ V ❑ R ❑ COS <br /> 603 CFR 112 .7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan ❑ V ❑ R ❑ COS <br /> 604 CFR 112 . 7(a)(3) (i) Plan failed to include oil type and storage capacity for each container ❑ V ❑ R ❑ COS <br /> 605 CFR 112.7(a)(3) (ii) Plan failed to adequately discuss discharge prevention measures , including routine handling ❑ V ❑ R ❑ COS <br /> 606 CFR 112 .7(a)(3) (iii) Plan failed to adequately discuss facility drainage or drainage controls ❑ V ❑ R ❑ COS <br /> 607 CFR 112 . 7(a)(3) (iv) Plan failed to include countermeasures for discharge discovery, response and cleanup ❑ V ❑ R ❑ COS <br /> 608 CFR 112.7(a)(3) (v) Plan failed to address disposal methods for recovered materials ❑ V ❑ R ❑ COS <br /> 609 CFR 112 .7(a)(3vi) , Plan failed to adequately contain procedures for reporting a discharge ❑ V ❑ R ❑ COS <br /> 112. 7(a4) <br /> 610 CFR 112 . 7(a) (5) Discharge procedures are not adequately addressed if the facility has no response plan ❑ V ❑ R ❑ COS <br /> 611 CFR 112 . 7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑ V ❑ R ❑ COS <br /> 612 CFR 112 . 7(c) Plan failed to include secondary containment, diversionary structures, or equip to prevent discharge ❑ V ❑ R ❑ COS <br /> 613 CFR 112 . 7(c) Failure to provide appropriate secondary containment, diversionary structures or equipment ❑ V ❑ R ❑ COS <br /> 614 CFR 112 . 7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures ❑ V ❑ R ❑ COS <br /> 615 CFR 112 . 7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability ❑ V ❑ R ❑ COS <br /> 616 CFR 112.7(d)(1 ) Failure to prepare an oil spill contingency plan when claiming impracticability of structures ❑ V ❑ R ❑ COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower, equipment, and materials to control and remove oil discharge ❑ V ❑ R ❑ COS <br /> 618 CFR 112.7(e) , 112.8(c) Failed to keep records of procedures , inspections, or integrity tests for three years ■ V ❑ R ❑ COS <br /> (6) <br /> 619 CFR 112. 7(f)(1 ) Failed to train personnel on all discharge prevention details listed in this section ❑ V ❑ R ❑ COS <br /> 620 CFR 112 . 7(f)(2) Failed to designate a person accountable for discharge prevention ❑ V ❑ R ❑ COS <br /> 621 CFR 112 .7(f) (1 ) Failure to include in the SPCC Plan an adequate description of employee training ❑ V ❑ R ❑ COS <br /> 622 CFR 112 .7(f) (3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel ❑ V ❑ R ❑ COS <br /> 623 CFR 112 .7(g) Plan failed to address security of site and valves, lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 624 CFR 112.7(g) Facility failed to implement security of site and valves, lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 625 CFR 112 .7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack ❑ V ❑ R ❑ COS <br /> 626 CFR 112 . 7(h)( 1 ) Loading/unloading rack containment system not adequate to contain spill ❑ V ❑ R ❑ COS <br /> 627 CFR 112 . 7(h)(2) Failed to provide vehicular departure system for loading and unloading racks ❑ V ❑ R ❑ COS <br /> FA0003934 PR0528989 SC001 11 /26/2018 <br /> EHD 28-01 Rev. 09/27/2018 Page 2 of 4 Aboveground Petroleum Storage Act OIR <br /> 1868 E . Hazelton Avenue Stockton , California 95205 1 T 209 468 -3420 F 209 464 -0138 1 www. sjcehd . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.