My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 4:18:14 PM
Creation date
1/17/2019 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 ❑Yes ❑ No ❑ N/A <br /> tanks.N/A is only appropriate for these alternatives. <br /> S For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment ❑Yes ❑ No ❑ N/A <br /> (where applicable) in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? ❑Yes ❑ NO ❑ N/A <br /> Reprove the liquid if it is found.If tank product is found,investigate possible leak <br /> Equipment on tank <br /> T If overfill equipment has a'lest"button,does it activate the audible horn or light ❑Yes ❑ No ❑ N/A <br /> to confirm operation?If battery operated,replace battery if needed. <br /> 6 Is overfill prevention equipment in goodworking condition?If it is equipped with a ❑Yes ❑ NO ❑ N/A <br /> mechanical test mechanism,actuate the mechanism to confirm operation. <br /> e Is the spill container(spill bucket)empty,free of visible leaks and in good working ❑Yes ❑ No ❑ N/A <br /> condition? <br /> 10 Are piping connections to the tank(valves,fittings,pumps,eta)free of visible leaks? ❑Yes ❑ <br /> Nobs:if"No',identify location and describe leak. <br /> No <br /> 11 Do the Ladders/platforms/walkways appear to be secure with no sign of severe corrosion ❑Yes ❑ NO ❑ N/A <br /> or damage? <br /> Containment(Diking/Impounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and ❑Yes ❑ NO ❑ N/A <br /> other integrity issues? <br /> 13 Are dike drain valves dosed and in good working condition? ❑Yes ❑ No ❑ N/A <br /> 14 Are containment egress pathways dear and any gates/doors operable? ❑Yes ❑ No ❑ N/A <br /> Concrete Exterior AST(CE-AST) <br /> Inpact <br /> 1/16'?pect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger <br /> 15 the ❑Yes ❑ NO ❑ N/A <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where ❑Yes ❑ No ❑ N/A <br /> applicable. Tank exterior in acceptable condltion? <br /> Visual impact all tank top openings including nipples,manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact ❑Yes ❑ No ❑ N/A <br /> and in good cendillon? <br /> Other Conditions <br /> 18 lathe system free of any other conditionsthat needto be addressedfor ❑Yes ❑ No <br /> continued sateoperation? <br /> Monthly Checklist Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.