Laserfiche WebLink
Note regarding Steel Tank Institute Standard Inspection Guldel in es STI SP001:STI SP001 requirements are not prepared <br /> or Issued with Inspection criteria that are readily applicable to other AST manufacturers especially to the concrete tonks. The SP <br /> SPOOL should make a notation to say:Inquirz with tfie manufacturer of the Yank before ut7lzing SPO0Ito inspecr your Conyou lt <br /> tar,k.5ome portions of5Tl SPOO l are applicable to the inspection ofConVaul suchos inspectlonfrequency.A copy ofthe STISPO01 <br /> Standard can be found at: <br /> wwwsteeltank.ram/Publications/STISPFAStore/tabid/487/Default.aspx <br /> In no case should a pressure test be performed on the secondary containment. Serious damage to-the tank system may <br /> resultfrom pressure testing. <br /> Merto manufacturer's drawings and specifications to confirm the configuration ofyour tank f you do not have drawings <br /> and spPoficatlons please contact me suppller or manufacturer or call l-888-965-3227. - <br /> Testing afConVault ranks moybe comphned bj quallbed personnel foliowing this resting methodology, <br /> Ifyou require assistdncesourcing a qudlfhedtesting professional please call 1-800-965-3227or visltwwwmnvaultcom. <br /> Testing should proceed only after reviewing all previous test recoros and any documentation detafliny modifications,repoirs, <br /> and vofble or known domage to thetank. - <br /> ConVoulttank systems feature anameplata wl ich-n til provide the Underwriters Laboratory listing serlal number, Include this _ <br /> numberin thedoeumenta;lano€.Insoectlons. - <br /> • This testing procedure will not applycr'maynotbeodequateif. <br /> • The ConVault has been moved Aram its original loch oon; <br /> • The.Con Vault has sustoned known orapporenl trauma or impact, <br /> • Product,Incompatible with the lnnersteel tank have been putinto the Con'✓ault. <br />