My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
7707
>
2800 - Aboveground Petroleum Storage Program
>
PR0538333
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 4:18:14 PM
Creation date
1/17/2019 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538333
PE
2832
FACILITY_ID
FA0021992
FACILITY_NAME
CDCR-California Health Care Facility
STREET_NUMBER
7707
STREET_NAME
AUSTIN
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
181-100-11
CURRENT_STATUS
01
SITE_LOCATION
7707 Austin Rd
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ins . Maintenance Checklist <br /> Inspection Da ` <br /> p to Inspector _ <br /> None This cl=klistis designed for ben ial u=.c. Some items may not apply. All equipment mspecnons and ...a mance <br /> should be dooem .ted You are.aroma edto make copies oflhis checklist. See the co nes pnndiagmainatia procedures <br /> and your owner's manual for corrective actions and more details. <br /> Weekly Maintenance: <br /> ❑ 1 Check leak detector for indication of fluid in interstice, (This is required by warranty.) if checked with <br /> a stick gauge,ensure the stick is clean and dry before insertion. <br /> ❑ 2. Check for leaks on the pumps,filters,hoses,nozzles,joints and fittings. <br /> ❑ 3. Check nipples, spill containment and manholes for paint or powder coating decay(required by - <br /> wartanty).Check piping and fitting for must. <br /> ❑ 4 Cheek pump meter and reset button. - <br /> ❑ 5 Check fuel gauge for propel-operation, if you have a Kruger At-A-Glance Gauge, check the clear cap <br /> for weathering or cracks. <br /> ❑ 6. Checkspll containment for debits. _ <br /> ❑ 7. Check for small cracks lin concrete, <br /> ❑ B. Check readability'of signs and decals. ' <br /> Mu nthlv:Maiatenance: <br /> ❑ 9. Check for wafer inthe primary,lank bottom under the fuel:(required by warranty). <br /> ❑ 10. Visually cheek the tank, including under the tank for any signs of leakage as required bythe <br /> Environmental Protection Agency 40 CFR 112. - <br /> ❑ 11 Check leak detector tube cap for corrosion and proper operation. If a Kmgermanual leak indicator is <br /> installed,mrnovctthe red fng and clear cap and check to see that the red indicator moves:up and down <br /> about 1 inch freely. Also, cheek for weathering or cracks in the clear cap. If electronic leak detection is - <br /> installed,check it.by using the test button, - - <br /> ❑ 12. Check all nozzles,hoses and fittings for wear and tear. <br /> ❑ 13. Chock trigger mechanism on nozzle for metal'fatigue orm'eclvnnieal failure. <br /> ❑ 14. Clock pump motor for signs of overheating or excessive wear. - <br /> ❑ 15. Check body of tank for cleanliness,need of paint,or rusting where applicable. Checksigns and decals <br /> but need of replacement Check slab and supports of unit for structural soundness, <br /> 0 16 Check grounding wires to see that they into properly attached to the tank terminals and grounding rod. <br /> Other Periodic Maintenance:. - <br /> ❑ 17 Replace the dispenser filter at least every six(6)hica the in as needed(mark the date replaced on the <br /> 'filter). - <br /> ❑ 18 Check fuel for bacterial infestation or microbial:growth. <br /> ❑ 19 clave a qualified.person periodically check all electrical wiring. - <br /> ❑ 20 Chcel the emergency relief vont at least once a year by lifting the top Lap and releasing it in ensure <br /> freedom of movement. <br /> ❑ 21. At least once a year,remove the leak detection device and check for proper operation. <br /> ❑ 22. At least once a yen, check thecalibration ofthe fuel gauge. <br /> ❑ 23. follow the pimp manufactur'er's recommendation for frequeory and procedures of maintenance. <br /> ❑ 24,. Document significant storage events par 40 CFR 112 mrd year state rogolations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.