My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:28:22 AM
Creation date
1/18/2019 11:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA J O A U Environmental health Department <br /> — <br /> -- . COUNTY ----- <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by Elb)- j. 2019 <br /> 1 . Site map enclosed? YESK NO [ ) ENVIRONMENTAL ENTAL HEAL <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all magk` � t� <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done . ( if adding piping , UDC' s , or other UST equipment, or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> .�.� s � �G /►/z � ,�ro � / � � � w;i�` oy � � � � � �� sem / <br /> /moi <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES [ ] NO <br /> b. Identify contractor performing decontamination: <br /> Name Phone C. <br /> Address City Zip <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.