My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 3:27:12 PM
Creation date
1/18/2019 11:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J O A Q U I N Environmental Health Department <br /> ,::CTU N T Y <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> QUICK SHOP 2072 W YOSEMITE AVE, MANTECA May 14, 2019 <br /> Item# Remarks <br /> Overall Inspection Comments: <br /> On site to witness overfill prevention equipment inspection for the 87 (2) product. The red tag#4224 was removed <br /> from the 87 (2)octane fill pipe for overfill prevention equipment inspection and placed back on after the testing was <br /> completed. Fuel levels were at 208 gallons at the time the inspector arrived/prior to the red tag removal. <br /> Measurements of the 87 product overfill valve: <br /> Riser=30 inches <br /> upper tube length required at 95%= 37.38 inches <br /> Actual upper tube length of 87 (2)=40 inches, the service technician determined that the overfill prevention <br /> equipment was below 95%. <br /> The red tags would not be removed until EHD fees have been paid and passing test results for overfill prevention <br /> equipment inspection are received and reviewed by EHD. <br /> This inspection is billable at the hourly rate of 152 dollars an hour. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: May 14, 2019 Inspector: Inspector Phone: <br /> Printed Name and Title: ZUNA BARKER, REHS (209)953-7311 <br /> Pete Chahoud, Operator <br /> FA0004625 PR0231426 SC333 05/14/2019 <br /> EHD 23-01 Rev.09/28/2018 Page 4 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.