My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 3:27:12 PM
Creation date
1/18/2019 11:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
liiiiiiiiiiiii IN; In INS <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 0 ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : Q 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the testing apparatus properly calibrated ? Q ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ 0 <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? Q ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑ ❑ X <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ 0 <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ 0 <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ X❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? 0 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑X ❑ ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> TESTED 100 AND 110 LEAK DETECTORS PASSED <br /> XIV. VACUUM I PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑X Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply. ) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/Pressure/Hydrostafic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.