Laserfiche WebLink
Stockton Water Supply Project Pipeline <br /> Specifications for Piezometer Monitoring <br /> Well Construction and Abandonment <br /> •.. tX:' <br /> G' ! <br /> G 30 � <br /> i'. <br /> ' Monitoring <br /> Zone <br /> &fl Masi <br /> Proposed Recharge <br /> t, Trench <br /> atiohs xAr <br /> Proposed <br /> V— Monitoring Eight Mile Road ` <br /> Existing Piezometers <br /> Monitoring _.•,T., .a 4::, . . „;i <br /> • o <br /> Well MW-10 • <br /> ja.. <br /> F <br /> Legend <br /> rr MTBE Plume Analytical Data from February 2009 <br /> • Dewatering Well Locations <br /> dpi.,r <br /> Figure 1-Proposed Monitoring Zone West of the Proposed Recharge Trench Location <br />