My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
13520
>
2900 - Site Mitigation Program
>
PR0527550
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:00:11 PM
Creation date
1/18/2019 4:46:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0527550
PE
2950
FACILITY_ID
FA0018662
FACILITY_NAME
COS DELTA WTR SUPPLY INTAKE PRJCT
STREET_NUMBER
13520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
13520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV/16/2007/FRI 08: 42 AM FAX No. • P. 001/001 <br /> Yaw- �'vY <br /> C IT-Y. O F S T O C K T O N <br /> DEPARTMENT OF MUNICIPAL UTILITIES <br /> 2500 Navy Drive • Stockton, CA 95206-1191 • 209/937-8750 - Fax 209/937-8708 <br /> www.stocktongov.com <br /> November 15, 2007 <br /> Adam Killinger, EIT <br /> Project Engineer <br /> Kleinfelder Inc. <br /> 2825 East Myrtle Street <br /> Stockton, California 95205 <br /> GEOTECHNICAL ANALYSIS AT THE WATER TREATMENT PLANT SITE <br /> This letter is in response to your request for a document to submit to the San Joaquin <br /> County Environmental Health Department which provides for access by Kleinfelder to <br /> the future water treatment plant site for geotechnical testing, including setting <br /> piezometers. Kleinfleder is working for the City of Stockton Municipal Utilities <br /> Department as a subconsultant to Camp Dresser & McKee to provide geotechnical <br /> testing for facilities related to the Delta Water Supply Project. Setting piezometers for <br /> testing at the future water treatment plant site, APN 059-030-02, is part of the scope of <br /> work under the consultant contract. As such, Kleinfelder has permission to enter the <br /> property to conduct all necessary geotechnical testing, including installation of <br /> piezometers. <br /> If you have any questions, please call Michael Callahan at 937-8994. <br /> MARK J. MADISON, P.E. <br /> DIRECTOR OF MUNICIPAL UTILITIES <br /> MJM:MC:pd <br /> ::ODMA\GRPWISE\COS.MUD.MUD_Ubmry:121977.1 Stockton <br /> All I' nlul <br /> I� <br /> 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.