Laserfiche WebLink
KLE/NFELOER <br /> .1IhlM M.fth, tkm. <br /> • 2 ANTICIPATED SCHEDULE <br /> Time Frame Description of Task <br /> 2 Weeks 1 - Workplan review and permitting* <br /> 3 Weeks 2 — Piezometer and Test Well installation, and development <br /> 1 Week 3 — Pumping Test <br /> 1 Week 4 — Piezometer and Test Well Abandonment <br /> 2 Weeks 5 — Report <br /> *Kleinfelder has no control over the time required to have the drilling permit approved. SJEHD approval <br /> for a permit can take up to 2 weeks. <br /> 87057/STO9L024 Page 7 of 7 February 5, 2009 <br /> Copyright 2009 Kleinfelder <br />