My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
13520
>
2900 - Site Mitigation Program
>
PR0527550
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:00 PM
Creation date
1/18/2019 5:01:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527550
PE
2950
FACILITY_ID
FA0018662
FACILITY_NAME
COS DELTA WTR SUPPLY INTAKE PRJCT
STREET_NUMBER
13520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
13520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> .1IhlM M.fth, tkm. <br /> • 2 ANTICIPATED SCHEDULE <br /> Time Frame Description of Task <br /> 2 Weeks 1 - Workplan review and permitting* <br /> 3 Weeks 2 — Piezometer and Test Well installation, and development <br /> 1 Week 3 — Pumping Test <br /> 1 Week 4 — Piezometer and Test Well Abandonment <br /> 2 Weeks 5 — Report <br /> *Kleinfelder has no control over the time required to have the drilling permit approved. SJEHD approval <br /> for a permit can take up to 2 weeks. <br /> 87057/STO9L024 Page 7 of 7 February 5, 2009 <br /> Copyright 2009 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.