Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): CIL <br /> [}1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply). '- <br /> ❑+ 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; [D 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: CO <br /> PRIMARY EMERGENCY COORDINATOR NAME- Alan Young PHONE NO.: (209) 546-1980 PHONE NO.: (209)200-7058 <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Pete McHenry PHONE NO.: (916) 383-3756 PHONE NO.: (916)207-1594 <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note.If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUPPROCEDURES <br /> Check the Rplicable boxes to indicate your facility's procedures for containing ills and preventing and mitigating releases,fires and/or explosions. <br /> Dl. <br /> d 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC., <br /> 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> Q 3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> Ej 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5 LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> Q 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> d 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> d 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> d 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> Q 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> El 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> [] 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> [' 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> [ 17.U SE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> d 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 0 20 PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS: <br /> D2. <br /> ❑21.OTHER(Specify); <br /> E.' FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): at. <br /> ❑ 1. BELLS; E2. <br /> ❑2. HORNS/SIRENS: <br /> 3 VERBAL(i.e.,Shouting); <br /> 4. OTHER(S ci ): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): F3. <br /> WEST SIDE OF THE FRONT GATE(EAST GATE)ON MARIPOSA ROAD(EXIT&ENTRANCE GATE) <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: ea. <br /> ❑ 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> Me 2.EVACUATION NLAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Speciw): <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS'FOR EMERGENCY SERVICE'S <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): P. <br /> (]1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />