My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
2800
>
2800 - Aboveground Petroleum Storage Program
>
PR0516358
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 9:25:47 AM
Creation date
1/25/2019 3:45:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516358
PE
2832
FACILITY_ID
FA0003774
FACILITY_NAME
VALLEY FARMS TRANSPORT
STREET_NUMBER
2800
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16528007
CURRENT_STATUS
01
SITE_LOCATION
2800 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for VALLEY FARMS TRANSPORT as of June 28, 2019. <br /> Open violations from January 15,2019 inspection <br /> Violation#102-Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA)regulated shell capacity of over 10,000 gallons. A <br /> Spill Prevention, Control, and Countermeasure(SPCC)Plan was not available on site. All facilities which have an <br /> APSA regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112,which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer(PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) A copy shall be <br /> maintained on site at all times. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.